resolution

Resolutions-2011-05

Dated January 12, 2011 10 pages Res. 2011-005, Res. 2011-004

Open the PDF

Page 3 of 10

Text from the PDF text layer; check the PDF for anything that matters.
2012- 2040 Long Range Plan - Federally Funded Transportation Infrastructure Projects Fxhihit A Project Title Project Descriptions( include type of:project` locatign, length, etc) I Cost Estimate Anticipated Year of Present, dollar) Construction ( 2012- 2020_, 2021- 2030, 2031- 2040 Ireland Ave ( Railroad St to Hwy 6) Grade& Pave Street, Install Curb, Gutter and Sidewalks or Trails 1, 800, 000 2010- 2015 Trail ( Jasper Ave to 1- 380) Grade and Pave Trail 238, 000 2010- 2015 Jasper Ave ( Hwy 6 south to Clear Creek Bridge) Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails 1, 000, 000 2010- 2015 Phase One Ireland Ave ( 1- 80 to Clear Creek) Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails 1, 500, 000 2015- 2020 Trail head east of Jasper Ave Grade and Pave Trailhead 30, 000 2015- 2020 Trailhead at Ireland Grade and Pave Trailhead 30, 000 2015- 2020 Ireland Ave ( Clear Creek Bridge to Railroad St.) Replace Bridge and Grade and Pave 1, 500, 000 2015- 2020 Jasper Ave ( Bridge to 1- 80) Phase Two Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails 1, 000, 000 2015- 2020 Jasper Ave ( Hwy 6 north 2000 ft) Phase Three Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails 1, 000, 000 2015- 2020 Trail south on Ireland to Villages Development Grade and Pave Trail 200, 000 2015- 2020 1 Jasper Ave ( Completed portion north to Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails 1, 000, 000 2020- 2025 Forevergreen, Rd) Phase Four Hwy 6 ( Ireland to Main St) Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails 1, 000, 000 2020- 2025 Hwy 6 ( Ste hans St to Jasper Ave.) Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails 2, 000, 000 2020- 2025 Hwy 6 ( Jasper Ave to 1- 380) Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails 1, 000, 000 2020- 2025 Interchange at Forevergreen Rd off 1- 380 Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails 20, 000, 000 2020- 2025 Forevergreen Jasper to James Ave) Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails 1, 000, 000 2025- 2030 34, 298, 000

Sources

  • laserfiche: Resolutions-2011-05 (Resolutions-2011 - 05.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.