Tiffin Recreation Center Monthly Report — L.3

Open the PDF

Page 12 of 19

Text from the PDF text layer; check the PDF for anything that matters.
Progress Photos Concrete finisher by studio rooms 1st concrete pour on the turf room. Laser screed was used to get the perfect flatness Vapor barrier installed ready for wire First section of handrail being installed mesh and concrete. Looking North around track down corridor by locker rooms 2nd floor prior to concrete pours Slab on grade pour by entrance and shower rooms Owner Progress Report | 250120 March 2026 Miron Construction Co., Inc. | 12