Tiffin Recreation Center Monthly Report — L.3
Page 12 of 19
Text from the PDF text layer; check the PDF for anything that matters.Progress Photos
Concrete finisher by studio rooms 1st concrete pour on the turf room.
Laser screed was used to get the
perfect flatness
Vapor barrier installed ready for wire
First section of handrail being installed
mesh and concrete. Looking North
around track
down corridor by locker rooms
2nd floor prior to concrete pours Slab on grade pour by entrance and
shower rooms
Owner Progress Report | 250120 March 2026 Miron Construction Co., Inc. | 12