Concrete on track looking East Last pour of 2nd floor, concrete on track
Overlooking gym, ready for slab on East gym stair installed with handrail
grade
Northwest ductwork installed Southwest and Southeast duct installed
Owner Progress Report | 250120 March 2026 Miron Construction Co., Inc. | 13