staff report memo · L-3
Tiffin Recreation Center Monthly Report — L.3
Page 11 of 19
Text from the PDF text layer; check the PDF for anything that matters.Progress Photos
Prepping slab on grade. Looking East First sections of track steel being
towards turf room installed
Exterior metal panel progress with the Track steel being installed along the
blue accent color North
Prepping slab on grade Main stair treads and landings poured
Owner Progress Report | 250120 March 2026 Miron Construction Co., Inc. | 11