ordinance
Ordinances-2018-423 - Subdivision Ordinance - Section 5
Page 2 of 4
Text from the PDF text layer; check the PDF for anything that matters.DocuSign Envelope ID: EEA0DCF5- 0A99-45DF-8E87-BAD5E70D675E
beofasize acceptable totheCounty Auditor. Ifmore than onesheet isused, each sheet
shall clearly show thenumber ofthesheet, thetotal number ofsheets included inthe plat,
andmatch lines indicating where other sheets adjoin.
remainder ofSection intentionally omitted andunchanged\]
Section IV. Amendment: Section5.13 U(ix)(a)REQUIREMENT OFTHE FINAL
PLAT ofthe Tiffin Subdivision Ordinance ishereby
amended asfollows:
ix.S
a. Anagreement executed bythe subdivider which agrees, asacovenant
running with theland, that theCity shall notissue abuilding permit forany lotinthe
subdivision until thesubdivider installs thepublic improvements, except sidewalks,
according toplans and specifications approved bytheCity Engineer and until theCity
Engineer approves subdivision erosion control measures. Ifthesubdivider desires a
building permit prior toinstalling theimprovements, theowner must deposit with the
City Finance Department anescrow equal tothecost ofimprovements plus 10percent
thereof incash
lotsinthesubdivision and collected onaperlotbasis prior totheissuance ofabuilding
permit. Subdivider must further agree, asacovenant running with the land, that
subdivider will install sidewalks abutting each lotinthesubdivision assetforth inthis
Title, that theobligation toinstall thesidewalks remains alien onthe lots abutting the
sidewalk until released bytheCity and that, intheevent subdivider fails toinstall the
sidewalk theCity may install thesidewalks andassess thetotal cost against theproperty
without meeting therequirements ofnotice, benefit orvalue required byState lawfor
assessing improvements.
Section V. Amendment: Section5.14 REVIEW; APPROVAL OR DISAPPROVAL
ofthe Tiffin Subdivision Ordinance ishereby amended asfollows:
5.14 REVIEW; APPROVAL ORDISAPPROVAL
A) Upon the filing ofthe final plat assetforth above, theCity Clerk shallsubmit 11
copies ofthefinalplat andtheapplication totheappropriate City Departments forreview
asdesignated bythe CityAdministrator;
B) Said designee(s)shall examine theapplication, theplat, theconstruction plans,
andthe legal documents toinsure compliance with therequirements oftheCityCode,
State law, andthepreliminary plat.
C) The costs oftheengineering examination ofthefinal plat, construction plans, and
anyother engineering administration costs andfees incurred inconjunction with thefinal
plat, shall bepaid bythesubdivider andshall bethe actual costs ofthe engineering
examination and review asincurred bytheCity.
Sources
- laserfiche: Ordinances-2018-423 - Subdivision Ordinance - Section 5 (Ordinances-2018-423 - Subdivision Ordinance - Section 5.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.