ordinance
Ordinances-2018-423 - Subdivision Ordinance - Section 5
Page 1 of 4
Text from the PDF text layer; check the PDF for anything that matters.DocuSign Envelope ID: EEA0DCF5- 0A99-45DF-8E87-BAD5E70D675E
CITY OFTIFFIN ORDINANCE NO. 2018-423
ANORDINANCE TOAMEND THE CITY OFTIFFIN, IOWA, SUBDIVISION
ORDINANCE NO. 1998-218, BYAMENDING CERTAIN PROVISIONS RELATING TO
FINAL PLAT REQUIREMENTS
BEITENACTED bytheCity Council ofthe City ofTiffinIowa:
Section I.Purpose: The purpose ofthisordinance isto allow forimprovements tobe
completed prior totheapproval ofthefinal plat assetforth intheamendment toArticle 5ofthe
Subdivision Ordinance.
Section II. Amendment: Section5.12 PERFORMANCE BOND PERMITTED ofthe
Tiffin Subdivision Ordinance ishereby revoked andreplaced with thefollowing:
5.12 ESCROW PERMITTED
Inlieu oftherequirement that improvements becompleted prior totheapproval ofafinal
plat, thesubdivider may deposit with theCity anescrow equal tothe cost of
improvements plus tenpercent (10%)thereof incash. However, such approval oftheplat
shall not constitute final acceptance ofany improvements tobeconstructed.
Improvements willbeaccepted only after their construction hasbeen completed.
Section III. Amendment: Section5.13 REQUIREMENT OF THE FINAL PLATof
theTiffin Subdivision Ordinance ishereby amended asfollows:
5.13 REQUIREMENTS OF THE FINAL PLAT
Thesubdivider shall, within one (1)year from thedateofapproval ofthepreliminary
plat, unless such time period hasbeen extended, prepare and file with the City Clerk,
twenty (20) copies ofthe final plat and required attachments, assetforth inthis
ordinance. Except forafinal platforaminor subdivision assetforth herein, nofinal plat
shall beconsidered bytheCity Council until and unless apreliminary plat forthearea
included intheproposed finalplat has been approved and hasnot expired andbecome
voidassetforth above. Copies ofthe Final Plat shall bedistributed tothe City Engineer
andtheCityAttorney fortheir review, andupon completion ofsame, theCity Engineer
and City Attorney shall report thefindings oftheir review totheCity Council forits
consideration regarding acceptance oftheFinal Play byresolution. Allresolutions
approving final plats shall berecorded bythe subdivider, with copies ofthe recorded
documents tobeprovided totheCity Attorney. Extensions oftimemay bepermitted in
order tofinalize and bring thefinal platinto compliance with this chapter and the
recommendations oftheCity Engineer, City Attorney orCity Staff.
The final plat shall bedrawn atascale ofoneinch equals onehundred feet (1" =100') or
larger. Sheet size shall benogreater than eighteen inches bytwenty-four inches (18" x
24") norsmaller than eight andone-half inches byeleven inches (8-1/2"x11") and shall
Sources
- laserfiche: Ordinances-2018-423 - Subdivision Ordinance - Section 5 (Ordinances-2018-423 - Subdivision Ordinance - Section 5.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.