Page 72 of 86

Text read by the vision model; check the PDF for anything that matters.
PROJECT INFORMATION REPORT BY: Rob Decker PHONE: (319) 333-9322 EMAIL: [email protected] OWNER: City of Tiffin PHONE: (515) 302-0143 LOCATION: Tiffin, Iowa CONTRACTOR: Woodruff Construction Phone Number: (319) 337-2410 EMAIL: [email protected] SITE WEATHER CONDITIONS Weather: 67°, slightly cloudy Time of Day: 10:00 am Site Conditions: site in good condition overall Rain This Week: 0.70" Rain This Month: 0.79" Deviation From Ave: (-0.15") CONSTRUCTION PROGRESS OVERVIEW Deerview park has been final graded and seeding applied. Site needs cleaned and basketball hoops installed. Woodfield Park has also been graded and seeded. Woodfield still requires seeding on northern strip and pipe being bored beneath concrete. A few concrete panels have cracked and require replacement. Dog park fencing has been completed and site has been seeded. Formwork needs picked up. Concession had plumbing and electrical scheduled. Tennis court concrete has been placed and has a light finish. Sidewalk needs completed. SCHEDULE • Deerview mulch near complete and basketball backboards and extension need installation • Woodfield needs seeded at the rear of the site, mulching, pipe bores, and concrete repair • Dog Park concrete work and cleanup • Tennis Court painting and fencing upcoming, concrete needs completed, concession stand plumbing and electrical • Deerview, Woodfield, Dog Park ready for final walkthrough and punch list

Sources

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.