Page 36 of 86

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>ITEM NO.</th> <th>CONTRACT ITEMS</th> <th>UNIT</th> <th>EST QTY</th> <th>UNIT PRICE</th> <th>CONTRACTOR's BID PRICE</th> <th colspan="2">Pay Period #5</th> <th colspan="2">TOTAL TO DATE</th> </tr> <tr> <th colspan="6">BID SCHEDULE</th> <th>QTY</th> <th>AMOUNT</th> <th>QTY</th> <th>AMOUNT</th> </tr> <tr> <td>(NOTE: Items shown in BOLD are the ADDENDUM CHANGES)</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>0010</td> <td>Clearing and Grubbing</td> <td>ACRE</td> <td>0.10</td> <td>$35,000.00</td> <td>$3,500.00</td> <td></td> <td></td> <td>0.10</td> <td>$3,500.00</td> </tr> <tr> <td>0020</td> <td>Clearing and Grubbing</td> <td>UNIT</td> <td>138.00</td> <td>$25.00</td> <td>$3,450.00</td> <td></td> <td></td> <td>173.30</td> <td>$4,332.50</td> </tr> <tr> <td>0030</td> <td>Embankment-in-Place</td> <td>CY</td> <td>770.00</td> <td>$9.00</td> <td>$6,930.00</td> <td></td> <td></td> <td>770.00</td> <td>$6,930.00</td> </tr> <tr> <td>0040</td> <td>Excavation, Class 10, Roadway & Borrow</td> <td>CY</td> <td>659.30</td> <td>$7.00</td> <td>$4,615.10</td> <td></td> <td></td> <td>659.30</td> <td>$4,615.10</td> </tr> <tr> <td>0050</td> <td>Topsill, Furnish & Spread</td> <td>CY</td> <td>100.00</td> <td>$35.00</td> <td>$3,500.00</td> <td>100.00</td> <td>$3,500.00</td> <td>100.00</td> <td>$3,500.00</td> </tr> <tr> <td>0060</td> <td>Modified Subbase</td> <td>CY</td> <td>19.00</td> <td>$34.25</td> <td>$650.75</td> <td></td> <td></td> <td>32.40</td> <td>$1,109.70</td> </tr> <tr> <td>0070</td> <td>Shoulder Construction, Eart</td> <td>STA</td> <td>69.10</td> <td>$315.00</td> <td>$21,766.50</td> <td>69.10</td> <td>$21,766.50</td> <td>69.10</td> <td>$21,766.50</td> </tr> <tr> <td>0080</td> <td>Base, Standard or Slip Form PC Concrete, 8 in.</td> <td>SY</td> <td>83.70</td> <td>$46.00</td> <td>$3,850.20</td> <td>94.95</td> <td>$4,367.70</td> <td>250.95</td> <td>$11,543.70</td> </tr> <tr> <td>0090</td> <td>Excavation, Class 20</td> <td>CY</td> <td>55.00</td> <td>$18.50</td> <td>$1,017.50</td> <td></td> <td></td> <td>55.00</td> <td>$1,017.50</td> </tr> <tr> <td>0100</td> <td>Steel Pipe Pedestrian Hand Railings</td> <td>LF</td> <td>108.00</td> <td>$105.00</td> <td>$11,340.00</td> <td>108.00</td> <td>$11,340.00</td> <td>108.00</td> <td>$11,340.00</td> </tr> <tr> <td>0110</td> <td>PreCast Concrete Box Culvert, 8' by 6'</td> <td>LF</td> <td>20.00</td> <td>$1,580.00</td> <td>$31,600.00</td> <td></td> <td></td> <td>20.00</td> <td>$31,600.00</td> </tr> <tr> <td>0120</td> <td>PreCast Concrete Box Culvert Straight End Section, 8' by 6'</td> <td>EACH</td> <td>2.00</td> <td>$10,300.00</td> <td>$20,600.00</td> <td></td> <td></td> <td>2.00</td> <td>$20,600.00</td> </tr> <tr> <td>0130</td> <td>Aprons, Metal, 30" Dia.</td> <td>EACH</td> <td>1.00</td> <td>$1,050.00</td> <td>$1,050.00</td> <td></td> <td></td> <td>2.00</td> <td>$2,100.00</td> </tr> <tr> <td>0140</td> <td>Culvert, Corrugated Metal Entrance Pipe, 30" Dia.</td> <td>LF</td> <td>16.00</td> <td>$63.00</td> <td>$1,008.00</td> <td></td> <td></td> <td>16.00</td> <td>$1,008.00</td> </tr> <tr> <td>0150</td> <td>Unclassified Aprons, 2000D RCP, 12" Dia.</td> <td>EACH</td> <td>2.00</td> <td>$1,400.00</td> <td>$2,800.00</td> <td></td> <td></td> <td>2.00</td> <td>$2,800.00</td> </tr> <tr> <td>0160</td> <td>Unclassified Pipe Culvert, 2000D RCP, 12" Dia.</td> <td>LF</td> <td>16.00</td> <td>$74.00</td> <td>$1,184.00</td> <td></td> <td></td> <td>16.00</td> <td>$1,184.00</td> </tr> <tr> <td>0170</td> <td>Engineering Fabric</td> <td>SY</td> <td>46.00</td> <td>$14.75</td> <td>$678.50</td> <td></td> <td></td> <td>65.76</td> <td>$969.96</td> </tr> <tr> <td>0180</td> <td>Bank Shaping</td> <td>LUMP</td> <td>1.00</td> <td>$2,400.00</td> <td>$2,400.00</td> <td></td> <td></td> <td>1.00</td> <td>$2,400.00</td> </tr> <tr> <td>0190</td> <td>Revetment Class E</td> <td>TON</td> <td>102.00</td> <td>$43.50</td> <td>$4,437.00</td> <td></td> <td></td> <td>101.71</td> <td>$4,424.39</td> </tr> <tr> <td>0200</td> <td>Recreational Trail, Portland Cement Concrete, 6"</td> <td>SY</td> <td>3,772.30</td> <td>$28.75</td> <td>$108,453.63</td> <td>254.67</td> <td>$7,321.76</td> <td>3,620.00</td> <td>$104,075.00</td> </tr> <tr> <td>0210</td> <td>Special Compaction of Subgrade for Recreational Trail</td> <td>STA</td> <td>34.05</td> <td>$350.00</td> <td>$11,917.50</td> <td></td> <td></td> <td>34.05</td> <td>$11,917.50</td> </tr> <tr> <td>0220</td> <td>Detectable Warnings</td> <td>SF</td> <td>80.00</td> <td>$35.00</td> <td>$2,800.00</td> <td>80.00</td> <td>$2,800.00</td> <td>80.00</td> <td>$2,800.00</td> </tr> <tr> <td>0230</td> <td>Entrance Bollard</td> <td>EACH</td> <td>4.00</td> <td>$2,000.00</td> <td>$8,000.00</td> <td>4.00</td> <td>$8,000.00</td> <td>4.00</td> <td>$8,000.00</td> </tr> <tr> <td>0240</td> <td>Removal & Reinstallation of Fence, Chain Link</td> <td>LF</td> <td>155.00</td> <td>$22.95</td> <td>$3,557.25</td> <td></td> <td></td> <td>155.00</td> <td>$3,557.25</td> </tr> <tr> <td>0250</td> <td>Wood Posts for Type A or B Signs, 4" x 4"</td> <td>LF</td> <td>164.00</td> <td>$16.00</td> <td>$2,624.00</td> <td>164.00</td> <td>$2,624.00</td> <td>164.00</td> <td>$2,624.00</td> </tr> <tr> <td>0260</td> <td>Type A Signs, Sheet Aluminum</td> <td>SF</td> <td>87.00</td> <td>$30.00</td> <td>$2,610.00</td> <td>74.44</td> <td>$2,233.20</td> <td>74.44</td> <td>$2,233.20</td> </tr> <tr> <td>0270</td> <td>Painted Pavement Marking, Waterborne or Solvent Based</td> <td>STA</td> <td>6.36</td> <td>$105.00</td> <td>$667.80</td> <td>6.36</td> <td>$667.80</td> <td>6.36</td> <td>$667.80</td> </tr> <tr> <td>0280</td> <td>Painted Symbols & Legends, Waterborne or Solvent Based</td> <td>EACH</td> <td>6.00</td> <td>$100.00</td> <td>$600.00</td> <td>6.00</td> <td>$600.00</td> <td>6.00</td> <td>$600.00</td> </tr> <tr> <td>0290</td> <td>Traffic Control</td> <td>LUMP</td> <td>1.00</td> <td>$2,000.00</td> <td>$2,000.00</td> <td>0.25</td> <td>$500.00</td> <td>1.00</td> <td>$2,000.00</td> </tr> <tr> <td>0300</td> <td>Flaggers</td> <td>EACH</td> <td>4.00</td> <td>$435.00</td> <td>$1,740.00</td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>0310</td> <td>Mobilization</td> <td>LUMP</td> <td>1.00</td> <td>$41,000.00</td> <td>$41,000.00</td> <td></td> <td></td> <td>1.00</td> <td>$41,000.00</td> </tr> <tr> <td>0320</td> <td>(Linear Feet Item) Treated Posts 6x6x6</td> <td>LF</td> <td>72.00</td> <td>$25.00</td> <td>$1,800.00</td> <td>66.00</td> <td>$1,650.00</td> <td>66.00</td> <td>$1,650.00</td> </tr> <tr> <td>0330</td> <td>Mulching</td> <td>ACRE</td> <td>1.00</td> <td>$1,000.00</td> <td>$1,000.00</td> <td>3.05</td> <td>$3,050.00</td> <td>3.05</td> <td>$3,050.00</td> </tr> <tr> <td>0340</td> <td>Seeding & Fertilizing (Rural)</td> <td>ACRE</td> <td>1.00</td> <td>$1,400.00</td> <td>$1,400.00</td> <td>3.05</td> <td>$4,270.00</td> <td>3.05</td> <td>$4,270.00</td> </tr> <tr> <td>0350</td> <td>Special Ditch Control, Wood Excelsior Mat</td> <td>SQ</td> <td>47.40</td> <td>$20.00</td> <td>$948.00</td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>0360</td> <td>Silt Fence</td> <td>LF</td> <td>466.00</td> <td>$2.00</td> <td>$932.00</td> <td></td> <td></td> <td>318.00</td> <td>$636.00</td> </tr> <tr> <td>0370</td> <td>Removal of Silt Fence or Silt Fence for Ditch Checks</td> <td>LF</td> <td>466.00</td> <td>$0.50</td> <td>$233.00</td> <td>318.00</td> <td>$159.00</td> <td>318.00</td> <td>$159.00</td> </tr> </table>

Sources

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.