minutes
Minutes-9/1/2016
Dated September 1, 2016City Council — regular meeting, September 1, 2016 86 pages
Ord. 2016-391, Ord. 2014-363, Ord. 2016-392, Ord. 2016-390, Ord. 2016, Res. 2016-063, Res. 2016-064, Res. 2016-065, Res. 2016-062, Res. 2016-042
Page 36 of 86
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>ITEM NO.</th>
<th>CONTRACT ITEMS</th>
<th>UNIT</th>
<th>EST QTY</th>
<th>UNIT PRICE</th>
<th>CONTRACTOR's BID PRICE</th>
<th colspan="2">Pay Period #5</th>
<th colspan="2">TOTAL TO DATE</th>
</tr>
<tr>
<th colspan="6">BID SCHEDULE</th>
<th>QTY</th>
<th>AMOUNT</th>
<th>QTY</th>
<th>AMOUNT</th>
</tr>
<tr>
<td>(NOTE: Items shown in BOLD are the ADDENDUM CHANGES)</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>0010</td>
<td>Clearing and Grubbing</td>
<td>ACRE</td>
<td>0.10</td>
<td>$35,000.00</td>
<td>$3,500.00</td>
<td></td>
<td></td>
<td>0.10</td>
<td>$3,500.00</td>
</tr>
<tr>
<td>0020</td>
<td>Clearing and Grubbing</td>
<td>UNIT</td>
<td>138.00</td>
<td>$25.00</td>
<td>$3,450.00</td>
<td></td>
<td></td>
<td>173.30</td>
<td>$4,332.50</td>
</tr>
<tr>
<td>0030</td>
<td>Embankment-in-Place</td>
<td>CY</td>
<td>770.00</td>
<td>$9.00</td>
<td>$6,930.00</td>
<td></td>
<td></td>
<td>770.00</td>
<td>$6,930.00</td>
</tr>
<tr>
<td>0040</td>
<td>Excavation, Class 10, Roadway & Borrow</td>
<td>CY</td>
<td>659.30</td>
<td>$7.00</td>
<td>$4,615.10</td>
<td></td>
<td></td>
<td>659.30</td>
<td>$4,615.10</td>
</tr>
<tr>
<td>0050</td>
<td>Topsill, Furnish & Spread</td>
<td>CY</td>
<td>100.00</td>
<td>$35.00</td>
<td>$3,500.00</td>
<td>100.00</td>
<td>$3,500.00</td>
<td>100.00</td>
<td>$3,500.00</td>
</tr>
<tr>
<td>0060</td>
<td>Modified Subbase</td>
<td>CY</td>
<td>19.00</td>
<td>$34.25</td>
<td>$650.75</td>
<td></td>
<td></td>
<td>32.40</td>
<td>$1,109.70</td>
</tr>
<tr>
<td>0070</td>
<td>Shoulder Construction, Eart</td>
<td>STA</td>
<td>69.10</td>
<td>$315.00</td>
<td>$21,766.50</td>
<td>69.10</td>
<td>$21,766.50</td>
<td>69.10</td>
<td>$21,766.50</td>
</tr>
<tr>
<td>0080</td>
<td>Base, Standard or Slip Form PC Concrete, 8 in.</td>
<td>SY</td>
<td>83.70</td>
<td>$46.00</td>
<td>$3,850.20</td>
<td>94.95</td>
<td>$4,367.70</td>
<td>250.95</td>
<td>$11,543.70</td>
</tr>
<tr>
<td>0090</td>
<td>Excavation, Class 20</td>
<td>CY</td>
<td>55.00</td>
<td>$18.50</td>
<td>$1,017.50</td>
<td></td>
<td></td>
<td>55.00</td>
<td>$1,017.50</td>
</tr>
<tr>
<td>0100</td>
<td>Steel Pipe Pedestrian Hand Railings</td>
<td>LF</td>
<td>108.00</td>
<td>$105.00</td>
<td>$11,340.00</td>
<td>108.00</td>
<td>$11,340.00</td>
<td>108.00</td>
<td>$11,340.00</td>
</tr>
<tr>
<td>0110</td>
<td>PreCast Concrete Box Culvert, 8' by 6'</td>
<td>LF</td>
<td>20.00</td>
<td>$1,580.00</td>
<td>$31,600.00</td>
<td></td>
<td></td>
<td>20.00</td>
<td>$31,600.00</td>
</tr>
<tr>
<td>0120</td>
<td>PreCast Concrete Box Culvert Straight End Section, 8' by 6'</td>
<td>EACH</td>
<td>2.00</td>
<td>$10,300.00</td>
<td>$20,600.00</td>
<td></td>
<td></td>
<td>2.00</td>
<td>$20,600.00</td>
</tr>
<tr>
<td>0130</td>
<td>Aprons, Metal, 30" Dia.</td>
<td>EACH</td>
<td>1.00</td>
<td>$1,050.00</td>
<td>$1,050.00</td>
<td></td>
<td></td>
<td>2.00</td>
<td>$2,100.00</td>
</tr>
<tr>
<td>0140</td>
<td>Culvert, Corrugated Metal Entrance Pipe, 30" Dia.</td>
<td>LF</td>
<td>16.00</td>
<td>$63.00</td>
<td>$1,008.00</td>
<td></td>
<td></td>
<td>16.00</td>
<td>$1,008.00</td>
</tr>
<tr>
<td>0150</td>
<td>Unclassified Aprons, 2000D RCP, 12" Dia.</td>
<td>EACH</td>
<td>2.00</td>
<td>$1,400.00</td>
<td>$2,800.00</td>
<td></td>
<td></td>
<td>2.00</td>
<td>$2,800.00</td>
</tr>
<tr>
<td>0160</td>
<td>Unclassified Pipe Culvert, 2000D RCP, 12" Dia.</td>
<td>LF</td>
<td>16.00</td>
<td>$74.00</td>
<td>$1,184.00</td>
<td></td>
<td></td>
<td>16.00</td>
<td>$1,184.00</td>
</tr>
<tr>
<td>0170</td>
<td>Engineering Fabric</td>
<td>SY</td>
<td>46.00</td>
<td>$14.75</td>
<td>$678.50</td>
<td></td>
<td></td>
<td>65.76</td>
<td>$969.96</td>
</tr>
<tr>
<td>0180</td>
<td>Bank Shaping</td>
<td>LUMP</td>
<td>1.00</td>
<td>$2,400.00</td>
<td>$2,400.00</td>
<td></td>
<td></td>
<td>1.00</td>
<td>$2,400.00</td>
</tr>
<tr>
<td>0190</td>
<td>Revetment Class E</td>
<td>TON</td>
<td>102.00</td>
<td>$43.50</td>
<td>$4,437.00</td>
<td></td>
<td></td>
<td>101.71</td>
<td>$4,424.39</td>
</tr>
<tr>
<td>0200</td>
<td>Recreational Trail, Portland Cement Concrete, 6"</td>
<td>SY</td>
<td>3,772.30</td>
<td>$28.75</td>
<td>$108,453.63</td>
<td>254.67</td>
<td>$7,321.76</td>
<td>3,620.00</td>
<td>$104,075.00</td>
</tr>
<tr>
<td>0210</td>
<td>Special Compaction of Subgrade for Recreational Trail</td>
<td>STA</td>
<td>34.05</td>
<td>$350.00</td>
<td>$11,917.50</td>
<td></td>
<td></td>
<td>34.05</td>
<td>$11,917.50</td>
</tr>
<tr>
<td>0220</td>
<td>Detectable Warnings</td>
<td>SF</td>
<td>80.00</td>
<td>$35.00</td>
<td>$2,800.00</td>
<td>80.00</td>
<td>$2,800.00</td>
<td>80.00</td>
<td>$2,800.00</td>
</tr>
<tr>
<td>0230</td>
<td>Entrance Bollard</td>
<td>EACH</td>
<td>4.00</td>
<td>$2,000.00</td>
<td>$8,000.00</td>
<td>4.00</td>
<td>$8,000.00</td>
<td>4.00</td>
<td>$8,000.00</td>
</tr>
<tr>
<td>0240</td>
<td>Removal & Reinstallation of Fence, Chain Link</td>
<td>LF</td>
<td>155.00</td>
<td>$22.95</td>
<td>$3,557.25</td>
<td></td>
<td></td>
<td>155.00</td>
<td>$3,557.25</td>
</tr>
<tr>
<td>0250</td>
<td>Wood Posts for Type A or B Signs, 4" x 4"</td>
<td>LF</td>
<td>164.00</td>
<td>$16.00</td>
<td>$2,624.00</td>
<td>164.00</td>
<td>$2,624.00</td>
<td>164.00</td>
<td>$2,624.00</td>
</tr>
<tr>
<td>0260</td>
<td>Type A Signs, Sheet Aluminum</td>
<td>SF</td>
<td>87.00</td>
<td>$30.00</td>
<td>$2,610.00</td>
<td>74.44</td>
<td>$2,233.20</td>
<td>74.44</td>
<td>$2,233.20</td>
</tr>
<tr>
<td>0270</td>
<td>Painted Pavement Marking, Waterborne or Solvent Based</td>
<td>STA</td>
<td>6.36</td>
<td>$105.00</td>
<td>$667.80</td>
<td>6.36</td>
<td>$667.80</td>
<td>6.36</td>
<td>$667.80</td>
</tr>
<tr>
<td>0280</td>
<td>Painted Symbols & Legends, Waterborne or Solvent Based</td>
<td>EACH</td>
<td>6.00</td>
<td>$100.00</td>
<td>$600.00</td>
<td>6.00</td>
<td>$600.00</td>
<td>6.00</td>
<td>$600.00</td>
</tr>
<tr>
<td>0290</td>
<td>Traffic Control</td>
<td>LUMP</td>
<td>1.00</td>
<td>$2,000.00</td>
<td>$2,000.00</td>
<td>0.25</td>
<td>$500.00</td>
<td>1.00</td>
<td>$2,000.00</td>
</tr>
<tr>
<td>0300</td>
<td>Flaggers</td>
<td>EACH</td>
<td>4.00</td>
<td>$435.00</td>
<td>$1,740.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>0310</td>
<td>Mobilization</td>
<td>LUMP</td>
<td>1.00</td>
<td>$41,000.00</td>
<td>$41,000.00</td>
<td></td>
<td></td>
<td>1.00</td>
<td>$41,000.00</td>
</tr>
<tr>
<td>0320</td>
<td>(Linear Feet Item) Treated Posts 6x6x6</td>
<td>LF</td>
<td>72.00</td>
<td>$25.00</td>
<td>$1,800.00</td>
<td>66.00</td>
<td>$1,650.00</td>
<td>66.00</td>
<td>$1,650.00</td>
</tr>
<tr>
<td>0330</td>
<td>Mulching</td>
<td>ACRE</td>
<td>1.00</td>
<td>$1,000.00</td>
<td>$1,000.00</td>
<td>3.05</td>
<td>$3,050.00</td>
<td>3.05</td>
<td>$3,050.00</td>
</tr>
<tr>
<td>0340</td>
<td>Seeding & Fertilizing (Rural)</td>
<td>ACRE</td>
<td>1.00</td>
<td>$1,400.00</td>
<td>$1,400.00</td>
<td>3.05</td>
<td>$4,270.00</td>
<td>3.05</td>
<td>$4,270.00</td>
</tr>
<tr>
<td>0350</td>
<td>Special Ditch Control, Wood Excelsior Mat</td>
<td>SQ</td>
<td>47.40</td>
<td>$20.00</td>
<td>$948.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>0360</td>
<td>Silt Fence</td>
<td>LF</td>
<td>466.00</td>
<td>$2.00</td>
<td>$932.00</td>
<td></td>
<td></td>
<td>318.00</td>
<td>$636.00</td>
</tr>
<tr>
<td>0370</td>
<td>Removal of Silt Fence or Silt Fence for Ditch Checks</td>
<td>LF</td>
<td>466.00</td>
<td>$0.50</td>
<td>$233.00</td>
<td>318.00</td>
<td>$159.00</td>
<td>318.00</td>
<td>$159.00</td>
</tr>
</table>
Sources
- laserfiche: Minutes-9/1/2016 (Minutes-9-1-2016.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.