packet
Packet: Tiffin Regular City Council Meeting (09/01/2026)
Dated September 1, 2026City Council — regular meeting, September 1, 2026 184 pages
Ord. 2026-529, Ord. 2017-398, Ord. 2017-399, Res. 2026-045
Page 167 of 184
Text from the PDF text layer; check the PDF for anything that matters. Terry Goerdt, Owner 319-330-9806 EIN: 33-2862208 [email protected]
Contract Service Agreement DRAFT
This contract for services is made affective as of ________________ , by and between Goerdt Inspections and Consultation
Services, LLC. and the City of Tiffin.
Description of Primary Services.
1. Permit and plan review.
2. Building, mechanical, electrical and property maintenance inspections.
3. Management of code or ordinance violations (to include MI, Notice of Abatement/Violation, etc.)
4. Contractor or resident liaison for items 1-4.
Description of other services available.
5. Additional services as requested
For example: municipal project management, nuisance code enforcement, zoning consultation, etc.
Payment. Payment to Goerdt Inspections and Consultation Services shall be made monthly following receipt of itemized
invoices. Payment at the hourly rate of $50.00 with a minimum of a two-hour charge for each inspection visit. This agreement
will be effective____________.
Term. This agreement will be auto renewed on an annual basis with a biennial evaluation of fees by Goerdt Inspection
Services, LLC.
Termination: Termination of this agreement may be made, in writing, by either party with 60 days notice. The notice shall
describe the details and reason of the termination request. Resolution of any defaults will be attempted prior to a termination
request.
Amendment: This agreement may be modified or amended if the amendment is made in writing, agreed upon, and is signed
by both parties.
_________________________________________ _________________________________________
Terry Goerdt, Owner- Goerdt Inspections.. Mayor/City Manager, City of Tiffin
Sheets in this document
- p. 16 plan sheet
- p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 24 Weatherstripping - Jamb Weatherstripping
- p. 25 Certifications: *Unnotched & Notched profiles available
- p. 26 Thresholds - Saddle
- p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
- p. 45 10A100 · Safety Plan · MSA · Overall Facility
- p. 46 10A101 · Life Safety Plan · MSA
- p. 47 Floor Limits (Graphical · MSA
- p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
- p. 49 Plan Review Comm · MSA · Proposed
- p. 50 Typical Architectural Details · MSA
- p. 51 Typical Details and Schedule Architectural Schedules · MSA
- p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
- p. 53 99H601 · HVAC Schedules · MSA
- p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
- p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
- p. 57 Typical Structural Details · MSA
- p. 58 MSA
- p. 62 Power Plan · MSA
- p. 77 EJ1A · Roof Trusses Layout
- p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
- p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
- p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
- p. 82 MT20 · Notes
- p. 160 Exhibit A: Project Location
Sources
- revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.