packet
Packet: Tiffin Regular City Council Meeting (09/01/2026)
Dated September 1, 2026City Council — regular meeting, September 1, 2026 184 pages
Ord. 2026-529, Ord. 2017-398, Ord. 2017-399, Res. 2026-045
Page 166 of 184
Text from the PDF text layer; check the PDF for anything that matters. AGENDA ITEM # K-3
AGENDA INFORMATION
TIFFIN CITY COUNCIL COMMUNICATION
DATE: August 27, 2026
AGENDA ITEM: Discussion and Consideration to Approve a Professional Service Agreement
with the Iowa DOT for the Highway 6 Improvements Project
ACTION: Motion
Background
The City has prepared a draft Contract Service Agreement with Goerdt Inspections and
Consultation Services, LLC for building and code-related services. The agreement is intended to
provide the City with inspection and consultation resources for permit and plan review, building
and property maintenance inspections, code and ordinance violations, and communication with
contractors and residents.
The proposed agreement identifies Terry Goerdt as the owner of Goerdt Inspections and
Consultation Services, LLC. The agreement is structured as an hourly professional services
arrangement, allowing the City to utilize services as needed rather than establishing a fixed
annual contract amount.
Under the proposed agreement, Goerdt Inspections and Consultation Services, LLC would be
compensated at an hourly rate of $50.00 per hour. Payment would be made monthly following
receipt of itemized invoices.
The agreement establishes a minimum charge of two hours for each inspection visit. No fixed
annual expenditure is identified in the agreement; total costs would therefore depend upon the
amount of services requested by the City.
Recommendation
Staff recommends approval of the Contract Service Agreement with Goerdt Inspections and
Consultation Services, LLC to provide building inspection, plan review, code enforcement, and
related consultation services to the City of Tiffin.
ATTACHMENTS: Agreement
1
Sheets in this document
- p. 16 plan sheet
- p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 24 Weatherstripping - Jamb Weatherstripping
- p. 25 Certifications: *Unnotched & Notched profiles available
- p. 26 Thresholds - Saddle
- p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
- p. 45 10A100 · Safety Plan · MSA · Overall Facility
- p. 46 10A101 · Life Safety Plan · MSA
- p. 47 Floor Limits (Graphical · MSA
- p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
- p. 49 Plan Review Comm · MSA · Proposed
- p. 50 Typical Architectural Details · MSA
- p. 51 Typical Details and Schedule Architectural Schedules · MSA
- p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
- p. 53 99H601 · HVAC Schedules · MSA
- p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
- p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
- p. 57 Typical Structural Details · MSA
- p. 58 MSA
- p. 62 Power Plan · MSA
- p. 77 EJ1A · Roof Trusses Layout
- p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
- p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
- p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
- p. 82 MT20 · Notes
- p. 160 Exhibit A: Project Location
Sources
- revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.