packet

Packet: Tiffin Regular City Council Meeting (09/01/2026)

Open the PDF Searchable PDF tesseract layer

Page 153 of 184

Text from the PDF text layer; check the PDF for anything that matters.
AGENDA ITEM # K-2 AGENDA INFORMATION TIFFIN CITY COUNCIL COMMUNICATION DATE: August 27, 2026 AGENDA ITEM: Discussion and Consideration to Approve a Professional Service Agreement with the Iowa DOT for the Highway 6 Improvements Project ACTION: Motion Background The Iowa Department of Transportation and the City of Tiffin have been working jointly on improvements to U.S. 6 through Tiffin. The City and Iowa DOT previously entered into Agreement No. 2025-P-001 for predesign, which was executed by the City on March 7, 2025, and by the Iowa DOT on March 17, 2025. The proposed Preconstruction Agreement establishes the current project concept and identifies the responsibilities and cost-sharing obligations of both parties. In addition to the primary highway improvements, the City has requested that the project incorporate several improvements within Tiffin, including: • New storm sewer and associated appurtenances; • New water main and associated appurtenances; • Sidewalk improvements; • Traffic signals at the intersection of U.S. 6 and Kimberlite Street; • Widening of U.S. 6 pavement; and • Extension of an existing box culvert. These City-requested improvements will be incorporated into the Iowa DOT project and constructed as part of the overall project. The agreement provides that these requested improvements will be at no cost to the Iowa DOT beyond the City's identified cost-share responsibilities. Under the agreement, the City will have several responsibilities associated with the project. The City will assist the Iowa DOT with inspection of the new water main and associated appurtenances. The City will also assume ownership and future maintenance responsibilities for the new water mains, traffic signals within the City's corporate boundaries, PCC sidewalks located outside Iowa DOT right-of-way, and the reconstructed portions of Main Street, Summerhays Street, Stephans Street, Croell Avenue, and Kimberlite Street. The City will also be responsible for relocating City-owned utilities when necessary for construction and for providing certain City-owned property or right-of-way required for the project. The agreement specifically provides temporary access to City-owned property near the Park Road roundabout for construction of the new water main. The City's estimated share of $3,920,988.98 is comprised primarily of improvements that are the City's responsibility, along with the City's six-percent share of applicable storm sewer costs. Exhibit B identifies the project costs by division, with Division 1 funded 100% by the Iowa 1

Sheets in this document

  • p. 16 plan sheet
  • p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 24 Weatherstripping - Jamb Weatherstripping
  • p. 25 Certifications: *Unnotched & Notched profiles available
  • p. 26 Thresholds - Saddle
  • p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 45 10A100 · Safety Plan · MSA · Overall Facility
  • p. 46 10A101 · Life Safety Plan · MSA
  • p. 47 Floor Limits (Graphical · MSA
  • p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
  • p. 49 Plan Review Comm · MSA · Proposed
  • p. 50 Typical Architectural Details · MSA
  • p. 51 Typical Details and Schedule Architectural Schedules · MSA
  • p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 53 99H601 · HVAC Schedules · MSA
  • p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
  • p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
  • p. 57 Typical Structural Details · MSA
  • p. 58 MSA
  • p. 62 Power Plan · MSA
  • p. 77 EJ1A · Roof Trusses Layout
  • p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
  • p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
  • p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
  • p. 82 MT20 · Notes
  • p. 160 Exhibit A: Project Location

Sources

  • revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.