packet
Packet: Tiffin Regular City Council Meeting (09/01/2026)
Dated September 1, 2026City Council — regular meeting, September 1, 2026 184 pages
Ord. 2026-529, Ord. 2017-398, Ord. 2017-399, Res. 2026-045
Page 152 of 184
Text from the PDF text layer; check the PDF for anything that matters.Expense Approval Report Payable Dates: 9/1/2026 - 9/1/2026
Account Summary
Account Number Account Name Payment Amount
307-210-6499 CONTRACTUAL - NORTH… 308,031.11
309-210-6407 ENGINEERING - US HWY … 35,976.85
600-810-6150 GROUP INSURANCE - W… 62.15
600-810-6345 WATER METERS 5,408.88
600-810-6371 UTILITIES - WATER 26,589.33
600-810-6373 TELEPHONE/COMM-WA… 152.05
600-810-6419 TECHNOLOGY SERVICES 947.93
600-810-6490 OTHER PROFESSIONAL S… 564.00
600-810-6501 CHEMICALS 6,817.22
600-810-6507 OPERATING SUPPLIES 289.19
600-810-6511 WATER TESTING SUPPLI… 62.94
600-810-6512 VEHICLE/EQUIPMENT F… 310.86
608-810-6407 ENGINEERING - WATER … 41,245.74
608-810-6499 CONTRACTUAL - WATER… 1,749,583.52
610-815-6150 GROUP INSURANCE - S… 62.15
610-815-6332 VEHICLE REPAIRS - SEW… 1,910.95
610-815-6371 UTILITIES - SEWER 12,996.29
610-815-6419 TECHNOLOGY SERVICES 947.93
610-815-6507 OPERATING SUPPLIES 289.19
610-815-6511 SEWER TESTING SUPPLIES 62.94
610-815-6512 VEHICLE/EQUIPMENT F… 310.86
610-815-6519 OPERATING EQUIPMENT 2,496.74
670-840-6499 RECYCLING CONTRACT 11,990.00
670-841-6499 GARBAGE CONTRACT 32,059.00
Grand Total: 2,338,695.14
Project Account Summary
Project Account Key Payment Amount
**None** 2,338,695.14
Grand Total: 2,338,695.14
8/28/2026 9:57:05 AM Page 5 of 5
Sheets in this document
- p. 16 plan sheet
- p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 24 Weatherstripping - Jamb Weatherstripping
- p. 25 Certifications: *Unnotched & Notched profiles available
- p. 26 Thresholds - Saddle
- p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
- p. 45 10A100 · Safety Plan · MSA · Overall Facility
- p. 46 10A101 · Life Safety Plan · MSA
- p. 47 Floor Limits (Graphical · MSA
- p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
- p. 49 Plan Review Comm · MSA · Proposed
- p. 50 Typical Architectural Details · MSA
- p. 51 Typical Details and Schedule Architectural Schedules · MSA
- p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
- p. 53 99H601 · HVAC Schedules · MSA
- p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
- p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
- p. 57 Typical Structural Details · MSA
- p. 58 MSA
- p. 62 Power Plan · MSA
- p. 77 EJ1A · Roof Trusses Layout
- p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
- p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
- p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
- p. 82 MT20 · Notes
- p. 160 Exhibit A: Project Location
Sources
- revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.