Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 160 FLOODPLAIN MANAGEMENT
B. Application for Permit. Application shall be made on forms furnished
by the Administrator and shall include the following:
(1) Description of the work to be covered by the permit for which
application is to be made.
(2) Description of the land on which the proposed work is to be
done (e.g., lot, block, track, street address, or similar description) that
will readily identify and locate the work to be done.
(3) Location and dimensions of all structures and additions.
(4) Indication of the use or occupancy for which the proposed
work is intended.
(5) Elevation of the base flood.
(6) Elevation (in relation to North American Vertical Datum
1988) of the lowest floor (including basement) of structures or of the
level to which a structure is to be floodproofed.
(7) For structures being improved or rebuilt, a detailed cost
estimate of proposed improvements and the market value of the
structure prior to the improvements. The detailed cost estimate shall
include the true cost of both labor and materials.
(8) Such other information as the Administrator deems
reasonably necessary (e.g., drawings or a site plan) for the purpose of
this chapter.
C. Action on Permit Application. The Administrator shall, within a
reasonable time, make a determination as to whether the proposed floodplain
development meets the applicable standards of this chapter and shall approve
or disapprove the application. For disapprovals, the applicant shall be
informed, in writing, of the specific reasons therefor. The Administrator shall
not issue permits for Variances except as directed by the Board of Appeals.
D. Construction and Use to Be as Provided in Application and Plans.
Floodplain Development Permits based on the basis of approved plans and
applications authorize only the use, arrangement, and construction set forth in
such approved plans and applications and no other use, arrangement or
construction. Any use, arrangement, or construction at Variance with that
authorized shall be deemed a violation of this chapter. The applicant shall be
required to submit certification by a professional engineer or land surveyor, as
appropriate, registered in the State, that the finished fill, structure floor
elevations, floodproofing, or other flood protection measures were
accomplished in compliance with the provisions of this chapter, prior to the
use or occupancy of any structure.
160.05 FLOODPLAIN MANAGEMENT STANDARDS.
1. General Floodplain Standards. All development must be consistent with the
need to minimize flood damage and meet the following applicable performance
standards. Where Base Flood Elevations have not been provided in the Flood
Insurance Study, the Iowa Department of Natural Resources shall be contacted to
determine: (i) whether the land involved is either wholly or partly within the floodway
or floodway fringe; and (ii) the Base Flood Elevation. Until a regulatory floodway is
CODE OF ORDINANCES, TIFFIN, IOWA
- 1411 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.