other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 390 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 160 FLOODPLAIN MANAGEMENT
b. The elevation to which new or substantially improved
structures have been floodproofed.
(4) Notify adjacent communities, counties, and the Department
of Natural Resources prior to any proposed alteration or relocation of
a watercourse and submit evidence of such notifications to the
Federal Emergency Management Agency.
(5) Keep a record of all permits, appeals, and such other
transactions and correspondence pertaining to the administration of
this chapter.
(6) Submit to the Federal Insurance Administrator an annual
report concerning the community’s participation, utilizing the annual
report form supplied by the Federal Insurance Administrator.
(7) Notify the Federal Insurance Administrator of any
annexations or modifications to the community’s boundaries.
(8) Review subdivision proposals to ensure such proposals are
consistent with the purpose of this chapter and advise the Board of
Appeals of potential conflict.
(9) Maintain the accuracy of the community’s Flood Insurance
Rate Maps when:
a. Development placed within the floodway results in
any of the following:
i. An increase in the Base Flood Elevation, or
ii. Alteration to the floodway boundary.
b. Development placed in Zones A, AE, AH, and A1-30
that does not include a designated floodway that will cause a
rise of more than one (1) foot in the Base Flood Elevation; or
c. Development relocates or alters the channel.
Within six (6) months of the completion of the development, the
applicant shall submit to FEMA all scientific and technical data
necessary for a Letter of Map Revision.
(10) Perform site inspections to ensure compliance with the
standards of this chapter.
(11) Forward all requests for Variances to the Board of Appeals
for consideration. Ensure all requests include the information
ordinarily submitted with applications as well as any additional
information deemed necessary to the Board of Appeals.
2. Floodplain Development Permit.
A. Permit Required. A Floodplain Development Permit issued by the
Administrator shall be secured prior to any floodplain development (any
manmade change to improved and unimproved real estate, including but not
limited to buildings or other structures, mining, filling, grading, paving,
storage of materials and equipment, excavation or drilling operations),
including the placement of factory-built homes.
CODE OF ORDINANCES, TIFFIN, IOWA
- 1410 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.