other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 378 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 158 SUDAS
Article 2.01 B. 4. Add the following article
“4. Gate Valves shall be American Flow Control Series
2500, Clow Figure F6100, Mueller Series 2360, or approved
equal. Preferences will be made for domestically made
products and materials. All valves shall be resilient wedge
gate valves with mechanical joints or “Alpha” ends (or
approved equal), two-inch square operating nut, open
counter-clockwise, and three-foot stem extensions.”
Article 2.02 C. 6. a. - d. Substitute the following for the specified
items
“a. One and one-half-inch pentagon operating nut, open
counter-clockwise.
b. Five-inch integrated Storz hose coupling pumper nozzle.
c. Nozzles shall have National Standard Hose threads.
d. Five and one fourth-inch main valve opening.
e. “Alpha” end inlet or approved equal.”
Article 2.02 C. 7. Add following Article
“7. Proposed hydrants shall be five and one fourth-inch Waterous
Pacer (WB67), Clow Medallion, or approved equal and painted Silver
in color with Red caps. Preferences will be made for domestically
made products and materials.
Hydrants shall be oriented such that the pumper nozzle faces the
street, or if at intersection, faces the higher classification street.”
Article 2.03 Add the following as 2.03 D.
2.03 D. Valve Box Adaptor
“Valve Box Adaptor II, manufactured by Adaptor Inc., or approved
equal, shall be installed between the valve body and valve box per
manufacturer’s recommendations.”
3. Division 7 Streets and Related Work.
A. Section 7030 Sidewalks, Shared Use Paths, and Driveways.
Article 1.08 A. 1. Make the following change:
“1.08. A.1-3 Measurement:
Measurement will be in square yards. No Deduction in area
will be made for manholes, storm sewer intakes, valve boxes,
or other structures less the two square yards in area. The
maximum payable trench width for trenched utility work
shall be computed based on pipe diameter and depth of cut.
Refer to Table 3-3 for maximum payable trench widths.
Pavement removal outside of the maximum trench width will
not be measured for payment unless directed by the
Engineer.”
CODE OF ORDINANCES, TIFFIN, IOWA
- 1382 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.