other · C

Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT

Open the PDF Searchable (OCR) PDF

Page 378 of 718

Text from the PDF text layer; check the PDF for anything that matters.
CHAPTER 158 SUDAS Article 2.01 B. 4. Add the following article “4. Gate Valves shall be American Flow Control Series 2500, Clow Figure F6100, Mueller Series 2360, or approved equal. Preferences will be made for domestically made products and materials. All valves shall be resilient wedge gate valves with mechanical joints or “Alpha” ends (or approved equal), two-inch square operating nut, open counter-clockwise, and three-foot stem extensions.” Article 2.02 C. 6. a. - d. Substitute the following for the specified items “a. One and one-half-inch pentagon operating nut, open counter-clockwise. b. Five-inch integrated Storz hose coupling pumper nozzle. c. Nozzles shall have National Standard Hose threads. d. Five and one fourth-inch main valve opening. e. “Alpha” end inlet or approved equal.” Article 2.02 C. 7. Add following Article “7. Proposed hydrants shall be five and one fourth-inch Waterous Pacer (WB67), Clow Medallion, or approved equal and painted Silver in color with Red caps. Preferences will be made for domestically made products and materials. Hydrants shall be oriented such that the pumper nozzle faces the street, or if at intersection, faces the higher classification street.” Article 2.03 Add the following as 2.03 D. 2.03 D. Valve Box Adaptor “Valve Box Adaptor II, manufactured by Adaptor Inc., or approved equal, shall be installed between the valve body and valve box per manufacturer’s recommendations.” 3. Division 7 Streets and Related Work. A. Section 7030 Sidewalks, Shared Use Paths, and Driveways. Article 1.08 A. 1. Make the following change: “1.08. A.1-3 Measurement: Measurement will be in square yards. No Deduction in area will be made for manholes, storm sewer intakes, valve boxes, or other structures less the two square yards in area. The maximum payable trench width for trenched utility work shall be computed based on pipe diameter and depth of cut. Refer to Table 3-3 for maximum payable trench widths. Pavement removal outside of the maximum trench width will not be measured for payment unless directed by the Engineer.” CODE OF ORDINANCES, TIFFIN, IOWA - 1382 -

Sources

  • revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...

This document's details as JSON

Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.