Text from the PDF text layer; check the PDF for anything that matters.H. Design Services
If authorized by the City, the selected firm may be retained to provide architectural and
engineering services through the design and construction phases, including:
• Schematic design.
• Design development.
• Construction documents.
• Architectural services.
• Civil engineering.
• Structural engineering.
• Mechanical engineering.
• Electrical engineering.
• Plumbing design.
• Fire protection systems.
• Communications and technology coordination.
• Landscape architecture, if appropriate.
• Surveying.
• Geotechnical coordination.
• Code and accessibility review.
• Energy-efficiency considerations.
• Permitting assistance.
• Construction cost estimating.
I. Bidding and Construction Administration
If authorized by the City, depending on the construction project delivery method or procurement
approach selected, additional services may include:
• Preparation of bidding documents.
• Assistance with advertising and bidding.
• Response to bidder questions.
• Addenda.
• Bid evaluation.
• Recommendation for award.
• Construction administration.
• Construction observation.
• Review of pay applications.
• Change order review.
• Submittal review.
• Project meetings.
• Punch-list development.
• Final inspection.
• Project closeout.