staff report memo · K-4

Discussion and Consideration to Approve sending out an RFQ for the Tiffin Fire Station Project and Council Action as Needed — K-4

Dated September 15, 2026City Council — regular meeting, September 15, 2026 15 pages

Open the PDF

Page 8 of 15

Text from the PDF text layer; check the PDF for anything that matters.
H. Design Services If authorized by the City, the selected firm may be retained to provide architectural and engineering services through the design and construction phases, including: • Schematic design. • Design development. • Construction documents. • Architectural services. • Civil engineering. • Structural engineering. • Mechanical engineering. • Electrical engineering. • Plumbing design. • Fire protection systems. • Communications and technology coordination. • Landscape architecture, if appropriate. • Surveying. • Geotechnical coordination. • Code and accessibility review. • Energy-efficiency considerations. • Permitting assistance. • Construction cost estimating. I. Bidding and Construction Administration If authorized by the City, depending on the construction project delivery method or procurement approach selected, additional services may include: • Preparation of bidding documents. • Assistance with advertising and bidding. • Response to bidder questions. • Addenda. • Bid evaluation. • Recommendation for award. • Construction administration. • Construction observation. • Review of pay applications. • Change order review. • Submittal review. • Project meetings. • Punch-list development. • Final inspection. • Project closeout. 6

Sources

Attached to agenda item: K-4 Discussion and Consideration to Approve sending out an RFQ for the Tiffin Fire Station...

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.