Discussion and Consideration to Approve sending out an RFQ for the Tiffin Fire Station Project and Council Action as Needed — K-4
Page 7 of 15
Text from the PDF text layer; check the PDF for anything that matters. • Site circulation.
• Parking.
• Outdoor operational areas.
• Future expansion opportunities.
The firm shall develop conceptual plans and/or diagrams sufficient to communicate the proposed
facility approach.
F. Conceptual Design
If authorized, the selected firm shall develop conceptual design alternatives addressing:
• Building configuration.
• Site layout.
• Apparatus circulation.
• Building orientation.
• Major building systems.
• Exterior appearance.
• Interior functional relationships.
• Sustainability and energy considerations.
• Future expansion.
• Preliminary construction costs.
The City may request multiple conceptual alternatives for consideration.
G. Cost Estimating
The selected firm shall provide preliminary opinions of probable construction cost at appropriate
stages of the project.
Cost information should identify, to the extent reasonably possible:
• Site development.
• Building construction.
• Mechanical systems.
• Electrical systems.
• Communications/technology infrastructure.
• Apparatus-related improvements.
• Furnishings and equipment, where applicable.
• Design and professional services.
• Contingencies.
• Other significant project costs.
The City expects cost estimates to be updated as the project develops.
5
Sources
- revize: K-4 (jGBDXz8QFK6wqWTYyhIFgOFNlwHfvr.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration to Approve sending out an RFQ for the Tiffin Fire Station...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.