Text from the PDF text layer; check the PDF for anything that matters. • Meet with City representatives, Fire Department personnel, and other appropriate
stakeholders.
• Review existing Fire Department operations, staffing, apparatus, equipment, and
anticipated future needs.
• Establish project goals, priorities, assumptions, and evaluation criteria.
• Develop a project work plan and anticipated schedule.
B. Fire Department Needs Assessment
The selected firm shall assist the City in identifying the operational and functional requirements
of the proposed facility, including, as appropriate:
• Fire apparatus and emergency vehicle requirements.
• Number and type of apparatus bays.
• Apparatus circulation and maneuvering.
• Administrative and office space.
• Training and meeting areas.
• Public access and potential community-use areas.
• Kitchen, dining, and common areas.
• Sleeping and restroom facilities, as appropriate.
• Storage requirements.
• Equipment and gear storage.
• Decontamination and support areas.
• Mechanical, electrical, communications, and technology requirements.
• Building maintenance and operational considerations.
• Future staffing, apparatus, and service needs.
• Potential future expansion.
The firm should identify any additional facility components or operational considerations it
believes should be addressed during the planning process.
C. Site Evaluation and Feasibility
For each site identified by the City, the selected firm shall evaluate, as applicable:
• Site size and configuration.
• Existing land use and zoning.
• Geotechnical considerations.
• Topography and drainage.
• Existing structures and site improvements.
• Utility availability and capacity.
• Water, sanitary sewer, and stormwater considerations.
• Electrical, gas, communications, and other utilities.
• Street access and roadway conditions.
• Emergency vehicle access and circulation.
3
Sources
- revize: K-4 (jGBDXz8QFK6wqWTYyhIFgOFNlwHfvr.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration to Approve sending out an RFQ for the Tiffin Fire Station...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.