staff report memo · K-4
Discussion and Consideration to Approve sending out an RFQ for the Tiffin Fire Station Project and Council Action as Needed — K-4
Page 4 of 15
Text from the PDF text layer; check the PDF for anything that matters.The City desires to conduct a comprehensive evaluation of two potential sites before making a
final determination regarding the location and development of the facility. The evaluation is
expected to consider the operational requirements of the Fire Department, emergency response
considerations, site characteristics, zoning and land-use requirements, utility availability, traffic
and access, development constraints, estimated development costs, and opportunities for future
consolidation and expansion.
The City may proceed with all, some, or none of the services identified in this RFQ, depending
upon the results of the site evaluation, project priorities, funding availability, and City Council
direction.
III. PROJECT OBJECTIVES
The City's primary objectives are to:
1. Evaluate the suitability and development potential of the two identified fire station sites.
2. Identify site constraints, opportunities, and potential development costs.
3. Determine the ability of potential sites to accommodate current and future Fire
Department operational needs.
4. Develop a preliminary understanding of facility space requirements and functional
relationships.
5. Identify appropriate site access, apparatus circulation, parking, emergency response, and
public access considerations.
6. Evaluate opportunities for future facility expansion.
7. Develop conceptual alternatives and preliminary cost information.
8. Assist the City in determining the most appropriate site and facility approach.
9. If authorized by the City, proceed with architectural and engineering design of the
selected fire station project.
10. Develop a facility that is functional, efficient, durable, maintainable, and responsive to
the long-term needs of the community.
IV. SCOPE OF SERVICES
The following scope represents the City's anticipated needs. Responding firms may recommend
modifications, additions, or alternative approaches based upon their experience with similar
projects.
A. Project Initiation and Information Gathering
The selected firm shall:
2
Sources
- revize: K-4 (jGBDXz8QFK6wqWTYyhIFgOFNlwHfvr.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration to Approve sending out an RFQ for the Tiffin Fire Station...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.