Text from the PDF text layer; check the PDF for anything that matters. ATTACHMENT A:
SCOPE OF SERVICES
Project Background
The City of Tiffin drilled (2) test wells in 2022. Both were drilled into the Silurian aquifer. One of the
test wells was drilled approximately 550 feet southeast of the water plant and the other well was
drilled east of Jim Bartels City Park. The City decided to put the well east of Jim Bartels City Park
into service which was named Well #5.
Because of the growth of the City and increased water demand, the City has decided to proceed
with putting the test well that is located southeast of the water plant, which is to be named Well #6,
into service. The City of Tiffin commissioned MSA Professional Services to provide design services
required to utilize the well for water production.
Project Description
The first step we would recommend is to acidize and test pump the well to determine what the
expected production of the well will be. MSA would assist the City is soliciting quotes from well
drillers for these services. Once the expected production is established, MSA would size the
distribution water main from the well to the water plant. The intent is that power to the well would
be fed from the water plant so that the generator that is located at the water plant could also be
utilized for standby power. A small (approximately 10’x10’) wellhouse would be constructed to
house the controls for the well. The raw water piping will not surface within the wellhouse, rather
metering and sampling will occur in a proposed below-grade metering vault.
SCOPE OF SERVICES
1. Project Management and Administration
a. Project Management
i. Manage and coordinate project team, budget, and schedules.
ii. Prepare and submit invoices. Invoices shall be submitted monthly and
are payable within 30 days of receipt.
b. Correspondence
i. Maintain communication with Owner and stakeholders on project.
ii. Provide regular design progress updates upon Owner request.
iii. Coordination with the Iowa Department of Natural Resources (IDNR) for
design and permitting.
iv. Coordination with City representatives to collect information and request
input on design decisions.
c. Quality Assurance/Quality Control
i. Employ documented quality-assurance/quality-control procedures
throughout project.
2. Meetings
a. Client Design Meetings
i. Attend one (1) design meeting for review of 30% drawings.
ii. Attend one (1) design meeting for review of 90% drawings.
b. Council Meetings (in person)
i. Attendance of two (2) council meetings to provide project updates.
c. Internal Design Meetings
i. Internal design progress meetings with all engaged service lines
(survey, civil, mechanical, electrical, plumbing, structural, architectural).
Page 7 of 10
(Attachment A: Scope of Services)
G:\13\13603\13603032\Contract\13603032 Tiffin Well #6 Design PSA 9-8-2026.docx
Sources
- revize: K-2 (fppq6CNYks0mOLG5CzwDV1goxVJUXS.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-2 Discussion and Consideration of Professional Services Agreement with MSA for the...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.