contract agreement · K-2
Discussion and Consideration of Professional Services Agreement with MSA for the Design of Well #6 and Council Action as Needed — K-2
Page 3 of 12
Text from the PDF text layer; check the PDF for anything that matters. MSA Project Number: 13603032
This AGREEMENT (Agreement) is made effective September 15, 2026, by and between:
MSA PROFESSIONAL SERVICES, INC. (MSA)
Address: 400 Ice Harbor Drive, Dubuque, IA 52001
Phone: (563) 582-3973
Representative: Clint Wienen Email: [email protected]
CITY OF TIFFIN (OWNER)
Address: 300 Railroad Street, Tiffin, IA 52340
Phone: 319.545.2572
Representative: Doug Boldt Email: [email protected]
Project Name: Tiffin Well #6 Design
The scope of the work authorized is: See Attachment A: Scope of Services
The schedule to perform the work is: Approximate Start Date: October 2026
Approximate Completion Date: February 2027
The lump sum fee for the work is: $84,000
All services shall be performed in accordance with the General Terms and Conditions of MSA,
which is attached and made part of this Agreement. Any attachments or exhibits referenced in
this Agreement are made part of this Agreement. Payment for these services will be on a lump
sum basis.
Approval: Authorization to proceed is acknowledged by signatures of the parties to this
Agreement.
CITY OF TIFFIN MSA PROFESSIONAL SERVICES, INC.
Doug Boldt Sarah Fosbinder, PE
City Administrator Team Leader
Date: Date: 9/8/2026
Page 1 of 10
G:\13\13603\13603032\Contract\13603032 Tiffin Well #6 Design PSA 9-8-2026.docx
Sources
- revize: K-2 (fppq6CNYks0mOLG5CzwDV1goxVJUXS.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-2 Discussion and Consideration of Professional Services Agreement with MSA for the...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.