K-3 - Change Order #17 – Rathje Construction, Original Town Urbanization Phase Two
Page 4 of 4
Text read by the vision model; check the PDF for anything that matters.Request For Change
To: RATHJE CONSTRUCTION CO
PO Box 408
305 44th Street
Marion, IA 52302
Project: Tiffin Urbanization Phase 2
RFC No: 04
Date: 6/7/2022
Description: SE corner of 2nd St & Main St had a damaged handhole in the way of new sidewalk. Work was performed on a time and material basis to provide a new handhole tier 15 rated and install it out of the way of the new sidewalk.
Material - 880
Labor - 760
Equipment - 425
The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated.
Upon approval the sum of $2,065.00 will be added to the contract price.
Authorized Signature: ________________________________ Date: __________
Price Electric LLC
Authorized Signature: ________________________________ Date: __________
RATHJE CONSTRUCTION CO