contract agreement · K-3
K-3 - Change Order #17 – Rathje Construction, Original Town Urbanization Phase Two
Page 3 of 4
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>Street</th>
<th>address</th>
<th>extra work completed</th>
</tr>
<tr>
<td rowspan="3">Summerhayes</td>
<td>221</td>
<td>Driveway / Walk</td>
</tr>
<tr>
<td>211</td>
<td>Driveway / Walk</td>
</tr>
<tr>
<td>140</td>
<td>Driveway Removal</td>
</tr>
<tr>
<td rowspan="4">E. Second</td>
<td>133</td>
<td>Driveway</td>
</tr>
<tr>
<td>115</td>
<td>Driveway</td>
</tr>
<tr>
<td>200</td>
<td>Grade east side to drain</td>
</tr>
<tr>
<td>110</td>
<td>Driveway</td>
</tr>
<tr>
<td rowspan="5">W. Second</td>
<td>101</td>
<td>Driveway</td>
</tr>
<tr>
<td>141</td>
<td>Driveway / Sidewalk</td>
</tr>
<tr>
<td>210</td>
<td>Sidewalk</td>
</tr>
<tr>
<td>211</td>
<td>Driveway / Sidewalk</td>
</tr>
<tr>
<td>239</td>
<td>Driveway / Sidewalk</td>
</tr>
</table>
Extra work was done after curb & Gutter or Paving was in.
Sources
- sharepoint (K-3 - Change Order #17 – Rathje Construction, Original Town Urbanization Phase Two.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.