contract agreement · K-2
K-2 - Pay Estimate 6 - Carter and Associates - Trail Phase 7
Page 3 of 3
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>ITEM</th>
<th>CONTRACT ITEMS</th>
<th>BID SCHEDULE UNIT</th>
<th>BID SCHEDULE QTY</th>
<th>UNIT PRICE</th>
<th>CONTRACTOR'S BID PRICE</th>
<th>Pay Period #5 QTY</th>
<th>Pay Period #5 AMOUNT</th>
<th>Pay Period #6 QTY</th>
<th>Pay Period #6 AMOUNT</th>
<th>TOTAL TO DATE QTY</th>
<th>TOTAL TO DATE AMOUNT</th>
</tr>
<tr>
<td colspan="12">(NOTE: Items shown in BOLD are the ADDENDUM CHANGES)</td>
</tr>
<tr>
<td>1</td>
<td>CLEARING AND GRADING</td>
<td>UNIT</td>
<td>0.80</td>
<td>$4,000.00</td>
<td>$3,200.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0.80</td>
<td>$3,200.00</td>
</tr>
<tr>
<td>2</td>
<td>EXCAVATION, CLASS 10, CONTRACTOR FURNISH</td>
<td>CY</td>
<td>6,120.00</td>
<td>$6.00</td>
<td>$36,720.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>6,120.00</td>
<td>$36,720.00</td>
</tr>
<tr>
<td>3</td>
<td>TOPSOIL, STRP, SALVAGE & RESPREAD</td>
<td>CY</td>
<td>650.00</td>
<td>$13.00</td>
<td>$8,450.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>650.00</td>
<td>$8,450.00</td>
</tr>
<tr>
<td>4</td>
<td>SUBGRADE PREPARATION</td>
<td>SY</td>
<td>1,311.30</td>
<td>$3.00</td>
<td>$3,933.90</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>1,311.30</td>
<td>$3,933.90</td>
</tr>
<tr>
<td>5</td>
<td>STORM SEWER, TRENCHED, 12 IN DIA.</td>
<td>STA</td>
<td>16.50</td>
<td>$250.00</td>
<td>$4,125.00</td>
<td>16.50</td>
<td>$4,125.00</td>
<td></td>
<td></td>
<td>16.50</td>
<td>$4,125.00</td>
</tr>
<tr>
<td>6</td>
<td>REMOVAL OF KNOWN PIPE CULVERTS, MISC. SIZE AND TYPE</td>
<td>LF</td>
<td>100.00</td>
<td>$7.00</td>
<td>$700.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>100.00</td>
<td>$700.00</td>
</tr>
<tr>
<td>7</td>
<td>STORM SEWER, TRENCHED, 24 IN DIA.</td>
<td>LF</td>
<td>24.00</td>
<td>$55.00</td>
<td>$1,320.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>24.00</td>
<td>$1,320.00</td>
</tr>
<tr>
<td>8</td>
<td>STORM SEWER, TRENCHED, 48 IN DIA.</td>
<td>LF</td>
<td>746.80</td>
<td>$145.00</td>
<td>$109,045.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>746.80</td>
<td>$109,045.00</td>
</tr>
<tr>
<td>9</td>
<td>PIPE APRON, RCP, 18 IN WITH GUARD</td>
<td>EACH</td>
<td>10.00</td>
<td>$1,200.00</td>
<td>$12,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>10.00</td>
<td>$12,000.00</td>
</tr>
<tr>
<td>10</td>
<td>PIPE APRON, RCP, 18 IN WITH GUARD</td>
<td>EACH</td>
<td>1.00</td>
<td>$1,320.00</td>
<td>$1,320.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>1.00</td>
<td>$1,320.00</td>
</tr>
<tr>
<td>11</td>
<td>PIPE APRON, RCP, 24 IN WITH GUARD</td>
<td>EACH</td>
<td>3.00</td>
<td>$1,600.00</td>
<td>$4,800.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>3.00</td>
<td>$4,800.00</td>
</tr>
<tr>
<td>12</td>
<td>PIPE APRON, RCP, 48 IN WITH GUARD</td>
<td>EACH</td>
<td>1.00</td>
<td>$3,200.00</td>
<td>$3,200.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>1.00</td>
<td>$3,200.00</td>
</tr>
<tr>
<td>13</td>
<td>PIPE APRON, RCP, 144IN X 144IN</td>
<td>EACH</td>
<td>1.00</td>
<td>$13,900.00</td>
<td>$13,900.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>1.00</td>
<td>$13,900.00</td>
</tr>
<tr>
<td>14</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>20.00</td>
<td>$18.00</td>
<td>$360.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>20.00</td>
<td>$360.00</td>
</tr>
<tr>
<td>15</td>
<td>REMOVAL OF PEDESTRIAN TRAIL</td>
<td>SY</td>
<td>89.00</td>
<td>$14.00</td>
<td>$1,246.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>89.00</td>
<td>$1,246.00</td>
</tr>
<tr>
<td>16</td>
<td>SIDEWALK, PCC, 6 IN</td>
<td>SY</td>
<td>26.40</td>
<td>$90.00</td>
<td>$2,376.00</td>
<td>26.40</td>
<td>$2,376.00</td>
<td></td>
<td></td>
<td>26.40</td>
<td>$2,376.00</td>
</tr>
<tr>
<td>17</td>
<td>SIDEWALK, PCC, 6 IN</td>
<td>SY</td>
<td>94.73</td>
<td>$33,998.54</td>
<td>3,184.54</td>
<td>5,014.54</td>
<td>$15,043.54</td>
<td></td>
<td></td>
<td>94.73</td>
<td>$35,978.54</td>
</tr>
<tr>
<td>18</td>
<td>DETECTABLE WARNING</td>
<td>SF</td>
<td>50.00</td>
<td>$40.00</td>
<td>$2,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>50.00</td>
<td>$2,000.00</td>
</tr>
<tr>
<td>19</td>
<td>DRIVEWAY, PAVED, PCC, 6 IN.</td>
<td>SY</td>
<td>49.10</td>
<td>$60.00</td>
<td>$2,946.00</td>
<td>49.10</td>
<td>$2,946.00</td>
<td></td>
<td></td>
<td>49.10</td>
<td>$2,946.00</td>
</tr>
<tr>
<td>20</td>
<td>DRIVEWAY, GRANULAR</td>
<td>TON</td>
<td>40.00</td>
<td>$14.00</td>
<td>$560.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>40.00</td>
<td>$560.00</td>
</tr>
<tr>
<td>21</td>
<td>PERFORATED STEEL TUBE POSTS FOR TYPE A SIGNS</td>
<td>LF</td>
<td>72.00</td>
<td>$11.00</td>
<td>$792.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>72.00</td>
<td>$792.00</td>
</tr>
<tr>
<td>22</td>
<td>PERFORATED STEEL TUBE POST ANCHOR, BREAKAWAY SOIL INSTALL.</td>
<td>LF</td>
<td>8.00</td>
<td>$100.00</td>
<td>$800.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>8.00</td>
<td>$800.00</td>
</tr>
<tr>
<td>23</td>
<td>REVEGETATION, CLASS E</td>
<td>TON</td>
<td>15.00</td>
<td>$60.00</td>
<td>$900.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>15.00</td>
<td>$900.00</td>
</tr>
<tr>
<td>24</td>
<td>REVEGETATION, CLASS D</td>
<td>TON</td>
<td>15.00</td>
<td>$60.00</td>
<td>$900.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>15.00</td>
<td>$900.00</td>
</tr>
<tr>
<td>25</td>
<td>EROSION STONE</td>
<td>TON</td>
<td>30.00</td>
<td>$55.00</td>
<td>$1,650.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>30.00</td>
<td>$1,650.00</td>
</tr>
<tr>
<td>26</td>
<td>Mobilization</td>
<td>LS</td>
<td>1.00</td>
<td>$10,000.00</td>
<td>$10,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>1.00</td>
<td>$10,000.00</td>
</tr>
<tr>
<td>27</td>
<td>TRAFFIC CONTROL</td>
<td>LS</td>
<td>1.00</td>
<td>$1,200.00</td>
<td>$1,200.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>1.00</td>
<td>$1,200.00</td>
</tr>
<tr>
<td>28</td>
<td>MANAGEMENT/PROTECTIVE LIABILITY INSURANCE FOR JAS RR</td>
<td>LS</td>
<td>1.00</td>
<td>$1,000.00</td>
<td>$1,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>1.00</td>
<td>$1,000.00</td>
</tr>
<tr>
<td>29</td>
<td>SLOPE PROTECTION, WOOD EXCELSIOR MAT</td>
<td>SO</td>
<td>7.00</td>
<td>$55.00</td>
<td>$385.00</td>
<td>1.00</td>
<td>$100.00</td>
<td></td>
<td></td>
<td>8.00</td>
<td>$485.00</td>
</tr>
<tr>
<td>30</td>
<td>STABILIZING CROP SEEDING, FERTILIZING, (RURAL)</td>
<td>ACRE</td>
<td>0.80</td>
<td>$400.00</td>
<td>$320.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0.80</td>
<td>$320.00</td>
</tr>
<tr>
<td>31</td>
<td>MULCHING</td>
<td>ACRE</td>
<td>0.80</td>
<td>$900.00</td>
<td>$720.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0.80</td>
<td>$720.00</td>
</tr>
<tr>
<td>32</td>
<td>CONVENTIONAL SEEDING, FERT., AND MULCHING</td>
<td>ACRE</td>
<td>3.00</td>
<td>$350.00</td>
<td>$1,050.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>3.00</td>
<td>$1,050.00</td>
</tr>
<tr>
<td>33</td>
<td>CONVENTIONAL SEEDING, FERT., AND MULCHING</td>
<td>ACRE</td>
<td>1.00</td>
<td>$2,230.00</td>
<td>$2,230.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>1.00</td>
<td>$2,230.00</td>
</tr>
<tr>
<td>34</td>
<td>PERIMETER/SLOPE SEDIMENT CONTROL DEVICE 12 INCH</td>
<td>LF</td>
<td>700.00</td>
<td>$2.05</td>
<td>$1,435.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>700.00</td>
<td>$1,435.00</td>
</tr>
<tr>
<td>35</td>
<td>REMOVE PERIMETER-SLOPE SEDIMENT CONTROL DEVICE</td>
<td>LF</td>
<td>700.00</td>
<td>$0.33</td>
<td>$231.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>700.00</td>
<td>$231.00</td>
</tr>
<tr>
<td colspan="12">TOTAL OF THE BASE BID (Total of Items 1-35): $30,211.54</td>
</tr>
<tr>
<td>CO1</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0.00</td>
<td></td>
</tr>
<tr>
<td>CO2</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0.00</td>
<td></td>
</tr>
<tr>
<td>CO3</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0.00</td>
<td></td>
</tr>
<tr>
<td>CO4</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0.00</td>
<td></td>
</tr>
<tr>
<td>CO5</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0.00</td>
<td></td>
</tr>
<tr>
<td>CO7</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0.00</td>
<td></td>
</tr>
<tr>
<td colspan="12">CHANGE ORDER SUB-TOTAL</td>
</tr>
<tr>
<td colspan="12"></td>
</tr>
<tr>
<td colspan="12">AMOUNT EARNED TOTAL</td>
<td>$30,211.54</td>
<td>$33,274.80</td>
<td>$286,698.34</td>
</tr>
<tr>
<td colspan="12">Materials Stored on-site</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td colspan="12">Materials Installed on-site (Deduct)</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td colspan="12">MATERIALS SUB-TOTAL</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td colspan="12">TOTAL</td>
<td>$30,211.54</td>
<td>$33,274.80</td>
<td>$286,698.34</td>
</tr>
</table>
Sources
- sharepoint (K-2 - Pay Estimate 6 - Carter and Associates - Trail Phase 7.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.