other · M-8

M-8 - Trail Options A and C - Soccer Field to Roundabout

Open the PDF

Page 2 of 2

Text from the PDF text layer; check the PDF for anything that matters.
15''SS D SS SAN W SS 100+00 FO FO FO FO FO T FO CO G G SS FO D D G D FO FO SAN SS FO FO FO 0 5 10 20 FO 10.0' < FOE P-1, 15" RCP SS S 55.7 LF @ 2.33% FO G FL = 678.42 FO T.O.P. = 679.86FO FO COVER = 2.03' G FO SS BOT. TRAIL = 681.89 R40' FO FL IN = 679.45 PROP. SURFACE G = 682.39 G SAN FL OUT = 679.35 6.04% SLOPE EXIST. TRAIL TO PARKING LOT LANDING G G < G FO G G G < P-2, 15" RCP 678.13 G 15" FES 101+00 134.7 LF @ 1.00% 1.5% SLOPE TO SOUTH FO E FL OUT = 678.0 SS 678.28 -1.5% SLOPE TO EAST SAN FO R5' SS SAN 102+00 E FO 3" FO SAN SAN SAN 103+00 10.0' 104+00 7.4' 105+00 105+79.67 NO. DATE REVISION BY PROJECT NO. PROJECT DATE: . DRAWN BY: DESIGNED BY: CHECKED BY: Init Init Init . . . . . . PLOT DATE: 3/2/2023 9:37 AM, G:\13\13603\13603006\CADD\Construction Documents\Exhibits\13603006 Exhibits.dwg . . . . . . . SIDEWALK CONNECTION TO SOCCER FIELDS CITY OF TIFFIN TIFFIN, IOWA SIDEWALK CONNECTION - OPTION C ---- SHEET C

Sources

  • sharepoint (M-8 - Trail Options A and C - Soccer Field to Roundabout.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.