other · M-8

M-8 - Trail Options A and C - Soccer Field to Roundabout

Open the PDF

Page 1 of 2

Text from the PDF text layer; check the PDF for anything that matters.
15''SS D SS SAN W SS 100+00 FO FO FO FO FO T FO CO G G SS FO D D G D FO FO SAN SS FO FO FO 0 5 10 20 FO 10.0' < FOE P-1, 15" RCP SS FO G S R25' 55.7 LF @ 2.33% FO FO FO G FO R25' SS 101+00 FO FL IN = 679.45 G SAN G FL OUT = 679.35 G G < G FO G G G < FL = 679.02 P-2, 15" RCP G T.O.P. = 680.46 15" FES 134.7 LF @ 1.00% FO COVER = 1.00' E FL OUT = 678.0 BOT. TRAIL = 681.46 SS PROP. SURFACE = 681.96 3.21% SLOPE TO EXIST. N. RAMP SAN 10.68% SLOPE TO EXIST. LOT FO 1.5% LANDING FOR 5' 5.0% SLOPE TO T.O.P. PROP. SURFACE = 679.79 NO COVER SURFACE = 680.96 SS STILL 8.89% SLOPE TO RAMP SAN E FO 102+00 3" FO SAN 13.0' SAN SAN 103+00 10.0' 104+00 7.4' 105+00 105+75 NO. DATE REVISION BY PROJECT NO. PROJECT DATE: . DRAWN BY: DESIGNED BY: CHECKED BY: Init Init Init . . . . . . PLOT DATE: 3/2/2023 9:44 AM, G:\13\13603\13603006\CADD\Construction Documents\Exhibits\13603006 Exhibits.dwg . . . . . . . SIDEWALK CONNECTION TO SOCCER FIELDS CITY OF TIFFIN TIFFIN, IOWA SIDEWALK CONNECTION - OPTION A ---- SHEET A

Sources

  • sharepoint (M-8 - Trail Options A and C - Soccer Field to Roundabout.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.