other · M-8
M-8 - Trail Options A and C - Soccer Field to Roundabout
Page 1 of 2
Text from the PDF text layer; check the PDF for anything that matters. 15''SS
D
SS
SAN
W
SS
100+00
FO FO
FO
FO FO T
FO
CO
G G
SS
FO D D
G D
FO FO
SAN
SS
FO
FO
FO 0 5 10 20
FO
10.0'
<
FOE P-1, 15" RCP
SS
FO
G
S
R25' 55.7 LF @ 2.33%
FO
FO FO
G
FO R25'
SS
101+00 FO FL IN = 679.45
G
SAN
G FL OUT = 679.35
G
G < G
FO
G
G
G
< FL = 679.02
P-2, 15" RCP G
T.O.P. = 680.46
15" FES 134.7 LF @ 1.00%
FO
COVER = 1.00'
E
FL OUT = 678.0 BOT. TRAIL = 681.46
SS
PROP. SURFACE = 681.96
3.21% SLOPE TO EXIST. N. RAMP
SAN
10.68% SLOPE TO EXIST. LOT
FO
1.5% LANDING FOR 5'
5.0% SLOPE TO T.O.P.
PROP. SURFACE = 679.79
NO COVER SURFACE = 680.96
SS
STILL 8.89% SLOPE TO RAMP
SAN
E
FO
102+00
3"
FO
SAN
13.0'
SAN
SAN
103+00
10.0'
104+00
7.4'
105+00
105+75
NO. DATE REVISION BY PROJECT NO.
PROJECT DATE: . DRAWN BY:
DESIGNED BY:
CHECKED BY:
Init
Init
Init
.
.
.
.
.
.
PLOT DATE: 3/2/2023 9:44 AM, G:\13\13603\13603006\CADD\Construction Documents\Exhibits\13603006 Exhibits.dwg
.
.
.
. .
.
.
SIDEWALK CONNECTION TO SOCCER FIELDS
CITY OF TIFFIN
TIFFIN, IOWA
SIDEWALK CONNECTION - OPTION A
----
SHEET
A
Sources
- sharepoint (M-8 - Trail Options A and C - Soccer Field to Roundabout.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.