resolution · I-2
I-2 - Resolution 2024-015 - Award of Bid for Kimberlite Street - South Improvements Project
Page 3 of 4
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>No.</th>
<th>Item Code</th>
<th>Item</th>
<th>Quantity</th>
<th>Unit</th>
<th colspan="2">Engineer's Estimate</th>
<th colspan="2">All American Concrete</th>
<th colspan="2">Peterson Contractors</th>
</tr>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th>Unit Price</th>
<th>Total Price</th>
<th>Unit Price</th>
<th>Total Price</th>
<th>Unit Price</th>
<th>Total Price</th>
</tr>
<tr>
<td>1</td>
<td>2010-108-C-0</td>
<td>Clearing and Grubbing and Removals</td>
<td>1</td>
<td>LS</td>
<td>$5,000.00</td>
<td>$5,000.00</td>
<td>$1,800.00</td>
<td>$1,800.00</td>
<td>$6,000.00</td>
<td>$6,000.00</td>
</tr>
<tr>
<td>2</td>
<td>2010-108-D-0</td>
<td>Strip, Stockpile and Respread Topsoil</td>
<td>400</td>
<td>CY</td>
<td>$10.00</td>
<td>$4,000.00</td>
<td>$18.00</td>
<td>$7,200.00</td>
<td>$9.50</td>
<td>$3,800.00</td>
</tr>
<tr>
<td>3</td>
<td>2010-108-E-0</td>
<td>Excavation, Class 10, Roadway and Borrow</td>
<td>800</td>
<td>CY</td>
<td>$6.50</td>
<td>$5,200.00</td>
<td>$11.00</td>
<td>$8,800.00</td>
<td>$10.00</td>
<td>$8,000.00</td>
</tr>
<tr>
<td>4</td>
<td>2010-108-F-0</td>
<td>Below Grade Excavation (Core Out)</td>
<td>100</td>
<td>CY</td>
<td>$75.00</td>
<td>$7,500.00</td>
<td>$63.00</td>
<td>$6,300.00</td>
<td>$50.00</td>
<td>$5,000.00</td>
</tr>
<tr>
<td>5</td>
<td>2010-108-G-0</td>
<td>Subgrade Preparation</td>
<td>2,300</td>
<td>SY</td>
<td>$4.00</td>
<td>$9,200.00</td>
<td>$2.00</td>
<td>$4,600.00</td>
<td>$2.00</td>
<td>$4,600.00</td>
</tr>
<tr>
<td>6</td>
<td>2010-108-I-0</td>
<td>Subbase, Modified, 4" Thick Rock for PCC Sidewalk</td>
<td>182</td>
<td>SY</td>
<td>$10.00</td>
<td>$1,820.00</td>
<td>$7.00</td>
<td>$1,274.00</td>
<td>$7.50</td>
<td>$1,365.00</td>
</tr>
<tr>
<td>7</td>
<td>2010-108-I-0</td>
<td>Subbase, Modified, 6" Thick Rock for Mainline Paving</td>
<td>2,105</td>
<td>SY</td>
<td>$15.00</td>
<td>$31,575.00</td>
<td>$9.00</td>
<td>$18,945.00</td>
<td>$7.50</td>
<td>$15,787.50</td>
</tr>
<tr>
<td>8</td>
<td>2010-108-I-0</td>
<td>Subbase, Modified, 12" Thick Rock for HMA Paving</td>
<td>295</td>
<td>SY</td>
<td>$20.00</td>
<td>$5,900.00</td>
<td>$18.00</td>
<td>$5,310.00</td>
<td>$15.50</td>
<td>$4,572.50</td>
</tr>
<tr>
<td>9</td>
<td>2010-108-E-0</td>
<td>Backfilling of Curbs</td>
<td>750</td>
<td>LF</td>
<td>$4.00</td>
<td>$3,000.00</td>
<td>$5.00</td>
<td>$3,750.00</td>
<td>$3.75</td>
<td>$2,812.50</td>
</tr>
<tr>
<td>10</td>
<td>3010-108-E-0</td>
<td>Granular Trench Backfill, Class A Crushed Stone, 24" Storm Sewer</td>
<td>145</td>
<td>LF</td>
<td>$25.00</td>
<td>$3,625.00</td>
<td>$15.00</td>
<td>$2,175.00</td>
<td>$45.25</td>
<td>$6,561.25</td>
</tr>
<tr>
<td>11</td>
<td>4020-108-A-1</td>
<td>Storm Sewer, Trenched, RCP, 24" Dia.</td>
<td>145</td>
<td>LF</td>
<td>$75.00</td>
<td>$10,875.00</td>
<td>$105.00</td>
<td>$15,225.00</td>
<td>$87.50</td>
<td>$12,687.50</td>
</tr>
<tr>
<td>12</td>
<td>4030-108-B-0</td>
<td>Storm Sewer Apron, RCP, 24" Dia.</td>
<td>1</td>
<td>EA</td>
<td>$1,500.00</td>
<td>$1,500.00</td>
<td>$4,405.00</td>
<td>$4,405.00</td>
<td>$2,555.00</td>
<td>$2,555.00</td>
</tr>
<tr>
<td>13</td>
<td>4040-108-A-0</td>
<td>Longitudinal Subdrain, Type 2, 6"</td>
<td>756</td>
<td>LF</td>
<td>$15.00</td>
<td>$11,340.00</td>
<td>$16.00</td>
<td>$12,096.00</td>
<td>$15.00</td>
<td>$11,340.00</td>
</tr>
<tr>
<td>14</td>
<td>4040-108-C-0</td>
<td>Connect Subdrain to Existing</td>
<td>2</td>
<td>EA</td>
<td>$750.00</td>
<td>$1,500.00</td>
<td>$250.00</td>
<td>$500.00</td>
<td>$325.00</td>
<td>$650.00</td>
</tr>
<tr>
<td>15</td>
<td>4040-108-D-0</td>
<td>Subdrain Outlet, Connection to Culvert</td>
<td>2</td>
<td>EA</td>
<td>$1,000.00</td>
<td>$2,000.00</td>
<td>$400.00</td>
<td>$800.00</td>
<td>$520.00</td>
<td>$1,040.00</td>
</tr>
<tr>
<td>16</td>
<td>6010-108-B-0</td>
<td>Storm Intake, Type SW-513, 48"x48"</td>
<td>1</td>
<td>EA</td>
<td>$7,500.00</td>
<td>$7,500.00</td>
<td>$4,800.00</td>
<td>$4,800.00</td>
<td>$5,000.00</td>
<td>$5,000.00</td>
</tr>
<tr>
<td>17</td>
<td>7010-108-A-0</td>
<td>PCC Pavement, 7"</td>
<td>1,847</td>
<td>SY</td>
<td>$60.00</td>
<td>$110,820.00</td>
<td>$46.65</td>
<td>$86,162.55</td>
<td>$46.65</td>
<td>$86,162.55</td>
</tr>
<tr>
<td>18</td>
<td>7020-108-B-0</td>
<td>HMA Pavement, 8"</td>
<td>261</td>
<td>SY</td>
<td>$75.00</td>
<td>$19,575.00</td>
<td>$82.50</td>
<td>$21,532.50</td>
<td>$110.20</td>
<td>$28,762.20</td>
</tr>
<tr>
<td>19</td>
<td>7030-108-E-0</td>
<td>PCC Sidewalk, 5"</td>
<td>182</td>
<td>SY</td>
<td>$60.00</td>
<td>$10,920.00</td>
<td>$53.00</td>
<td>$9,646.00</td>
<td>$53.00</td>
<td>$9,646.00</td>
</tr>
<tr>
<td>20</td>
<td>7030-108-G-0</td>
<td>Detectable Warnings</td>
<td>52</td>
<td>SF</td>
<td>$60.00</td>
<td>$3,120.00</td>
<td>$60.00</td>
<td>$3,120.00</td>
<td>$60.00</td>
<td>$3,120.00</td>
</tr>
<tr>
<td>21</td>
<td>7040-108-H-0</td>
<td>Removal of Pavement</td>
<td>488</td>
<td>SY</td>
<td>$10.00</td>
<td>$4,880.00</td>
<td>$5.00</td>
<td>$2,440.00</td>
<td>$13.50</td>
<td>$6,588.00</td>
</tr>
<tr>
<td>22</td>
<td>8020-108-B-0</td>
<td>Painted Pavement Markings, Solvent/Waterborne</td>
<td>12.90</td>
<td>STA</td>
<td>$200.00</td>
<td>$2,580.00</td>
<td>$220.00</td>
<td>$2,838.00</td>
<td>$365.00</td>
<td>$4,708.50</td>
</tr>
<tr>
<td>23</td>
<td>8030-108-G-0</td>
<td>Painted Symbols and Legends</td>
<td>6</td>
<td>EA</td>
<td>$250.00</td>
<td>$1,500.00</td>
<td>$110.00</td>
<td>$660.00</td>
<td>$100.00</td>
<td>$600.00</td>
</tr>
<tr>
<td>24</td>
<td>8030-108-A-0</td>
<td>Traffic Control</td>
<td>1</td>
<td>LS</td>
<td>$5,000.00</td>
<td>$5,000.00</td>
<td>$2,750.00</td>
<td>$2,750.00</td>
<td>$5,000.00</td>
<td>$5,000.00</td>
</tr>
<tr>
<td>25</td>
<td>9010-108-A-3</td>
<td>Mulching for Erosion Control</td>
<td>0.25</td>
<td>ACRE</td>
<td>$1,500.00</td>
<td>$375.00</td>
<td>$3,300.00</td>
<td>$825.00</td>
<td>$3,000.00</td>
<td>$750.00</td>
</tr>
<tr>
<td>26</td>
<td>9010-108-B-3</td>
<td>Seeding, Fertilizing and Mulching for Hydraulic Seeding, Type 1 Seed Mixture</td>
<td>0.25</td>
<td>ACRE</td>
<td>$5,000.00</td>
<td>$1,250.00</td>
<td>$8,250.00</td>
<td>$2,062.50</td>
<td>$7,500.00</td>
<td>$1,875.00</td>
</tr>
<tr>
<td>27</td>
<td>9040-108-A-2</td>
<td>SWPPP Management</td>
<td>1</td>
<td>LS</td>
<td>$5,000.00</td>
<td>$5,000.00</td>
<td>$1,650.00</td>
<td>$1,650.00</td>
<td>$1,500.00</td>
<td>$1,500.00</td>
</tr>
<tr>
<td>28</td>
<td>9040-108-J-0</td>
<td>Erosion Stone Riprap</td>
<td>20</td>
<td>TONS</td>
<td>$50.00</td>
<td>$1,000.00</td>
<td>$75.00</td>
<td>$1,500.00</td>
<td>$55.00</td>
<td>$1,100.00</td>
</tr>
<tr>
<td>29</td>
<td>9040-108-N-1</td>
<td>Silt Fence</td>
<td>500</td>
<td>LF</td>
<td>$3.00</td>
<td>$1,500.00</td>
<td>$2.20</td>
<td>$1,100.00</td>
<td>$2.00</td>
<td>$1,000.00</td>
</tr>
<tr>
<td>30</td>
<td>9040-108-N-1</td>
<td>Filter Sock</td>
<td>500</td>
<td>LF</td>
<td>$3.00</td>
<td>$1,500.00</td>
<td>$2.75</td>
<td>$1,375.00</td>
<td>$2.50</td>
<td>$1,250.00</td>
</tr>
<tr>
<td>31</td>
<td>9040-108-N-2</td>
<td>Silt Fence, Clean Out Sediment</td>
<td>500</td>
<td>LF</td>
<td>$1.00</td>
<td>$500.00</td>
<td>$0.55</td>
<td>$275.00</td>
<td>$0.50</td>
<td>$250.00</td>
</tr>
<tr>
<td>32</td>
<td>9040-108-S-1</td>
<td>Inlet Protection Device</td>
<td>1</td>
<td>FA</td>
<td>$750.00</td>
<td>$750.00</td>
<td>$110.00</td>
<td>$110.00</td>
<td>$100.00</td>
<td>$100.00</td>
</tr>
<tr>
<td>33</td>
<td>9040-108-S-2</td>
<td>Inlet Protection Device Maintenance</td>
<td>1</td>
<td>EA</td>
<td>$200.00</td>
<td>$200.00</td>
<td>$55.00</td>
<td>$55.00</td>
<td>$50.00</td>
<td>$50.00</td>
</tr>
<tr>
<td>34</td>
<td>11010-108-A-0</td>
<td>Construction Survey</td>
<td>1</td>
<td>LS</td>
<td>$5,000.00</td>
<td>$5,000.00</td>
<td>$3,500.00</td>
<td>$3,500.00</td>
<td>$4,250.00</td>
<td>$4,250.00</td>
</tr>
<tr>
<td>35</td>
<td>11020-108-A-0</td>
<td>Mobilization</td>
<td>1</td>
<td>LS</td>
<td>$25,000.00</td>
<td>$25,000.00</td>
<td>$9,000.00</td>
<td>$9,000.00</td>
<td>$14,500.00</td>
<td>$14,500.00</td>
</tr>
</table>
*Numbers in italics differ from submitted bid form
$312,005.00 $248,581.55 $262,983.50
Sources
- sharepoint (I-2 - Resolution 2024-015 - Award of Bid for Kimberlite Street - South Improvements Project.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.