resolution · I-2

I-2 - Resolution 2024-015 - Award of Bid for Kimberlite Street - South Improvements Project

Open the PDF Searchable (OCR) PDF

Page 3 of 4

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>No.</th> <th>Item Code</th> <th>Item</th> <th>Quantity</th> <th>Unit</th> <th colspan="2">Engineer's Estimate</th> <th colspan="2">All American Concrete</th> <th colspan="2">Peterson Contractors</th> </tr> <tr> <th></th> <th></th> <th></th> <th></th> <th></th> <th>Unit Price</th> <th>Total Price</th> <th>Unit Price</th> <th>Total Price</th> <th>Unit Price</th> <th>Total Price</th> </tr> <tr> <td>1</td> <td>2010-108-C-0</td> <td>Clearing and Grubbing and Removals</td> <td>1</td> <td>LS</td> <td>$5,000.00</td> <td>$5,000.00</td> <td>$1,800.00</td> <td>$1,800.00</td> <td>$6,000.00</td> <td>$6,000.00</td> </tr> <tr> <td>2</td> <td>2010-108-D-0</td> <td>Strip, Stockpile and Respread Topsoil</td> <td>400</td> <td>CY</td> <td>$10.00</td> <td>$4,000.00</td> <td>$18.00</td> <td>$7,200.00</td> <td>$9.50</td> <td>$3,800.00</td> </tr> <tr> <td>3</td> <td>2010-108-E-0</td> <td>Excavation, Class 10, Roadway and Borrow</td> <td>800</td> <td>CY</td> <td>$6.50</td> <td>$5,200.00</td> <td>$11.00</td> <td>$8,800.00</td> <td>$10.00</td> <td>$8,000.00</td> </tr> <tr> <td>4</td> <td>2010-108-F-0</td> <td>Below Grade Excavation (Core Out)</td> <td>100</td> <td>CY</td> <td>$75.00</td> <td>$7,500.00</td> <td>$63.00</td> <td>$6,300.00</td> <td>$50.00</td> <td>$5,000.00</td> </tr> <tr> <td>5</td> <td>2010-108-G-0</td> <td>Subgrade Preparation</td> <td>2,300</td> <td>SY</td> <td>$4.00</td> <td>$9,200.00</td> <td>$2.00</td> <td>$4,600.00</td> <td>$2.00</td> <td>$4,600.00</td> </tr> <tr> <td>6</td> <td>2010-108-I-0</td> <td>Subbase, Modified, 4" Thick Rock for PCC Sidewalk</td> <td>182</td> <td>SY</td> <td>$10.00</td> <td>$1,820.00</td> <td>$7.00</td> <td>$1,274.00</td> <td>$7.50</td> <td>$1,365.00</td> </tr> <tr> <td>7</td> <td>2010-108-I-0</td> <td>Subbase, Modified, 6" Thick Rock for Mainline Paving</td> <td>2,105</td> <td>SY</td> <td>$15.00</td> <td>$31,575.00</td> <td>$9.00</td> <td>$18,945.00</td> <td>$7.50</td> <td>$15,787.50</td> </tr> <tr> <td>8</td> <td>2010-108-I-0</td> <td>Subbase, Modified, 12" Thick Rock for HMA Paving</td> <td>295</td> <td>SY</td> <td>$20.00</td> <td>$5,900.00</td> <td>$18.00</td> <td>$5,310.00</td> <td>$15.50</td> <td>$4,572.50</td> </tr> <tr> <td>9</td> <td>2010-108-E-0</td> <td>Backfilling of Curbs</td> <td>750</td> <td>LF</td> <td>$4.00</td> <td>$3,000.00</td> <td>$5.00</td> <td>$3,750.00</td> <td>$3.75</td> <td>$2,812.50</td> </tr> <tr> <td>10</td> <td>3010-108-E-0</td> <td>Granular Trench Backfill, Class A Crushed Stone, 24" Storm Sewer</td> <td>145</td> <td>LF</td> <td>$25.00</td> <td>$3,625.00</td> <td>$15.00</td> <td>$2,175.00</td> <td>$45.25</td> <td>$6,561.25</td> </tr> <tr> <td>11</td> <td>4020-108-A-1</td> <td>Storm Sewer, Trenched, RCP, 24" Dia.</td> <td>145</td> <td>LF</td> <td>$75.00</td> <td>$10,875.00</td> <td>$105.00</td> <td>$15,225.00</td> <td>$87.50</td> <td>$12,687.50</td> </tr> <tr> <td>12</td> <td>4030-108-B-0</td> <td>Storm Sewer Apron, RCP, 24" Dia.</td> <td>1</td> <td>EA</td> <td>$1,500.00</td> <td>$1,500.00</td> <td>$4,405.00</td> <td>$4,405.00</td> <td>$2,555.00</td> <td>$2,555.00</td> </tr> <tr> <td>13</td> <td>4040-108-A-0</td> <td>Longitudinal Subdrain, Type 2, 6"</td> <td>756</td> <td>LF</td> <td>$15.00</td> <td>$11,340.00</td> <td>$16.00</td> <td>$12,096.00</td> <td>$15.00</td> <td>$11,340.00</td> </tr> <tr> <td>14</td> <td>4040-108-C-0</td> <td>Connect Subdrain to Existing</td> <td>2</td> <td>EA</td> <td>$750.00</td> <td>$1,500.00</td> <td>$250.00</td> <td>$500.00</td> <td>$325.00</td> <td>$650.00</td> </tr> <tr> <td>15</td> <td>4040-108-D-0</td> <td>Subdrain Outlet, Connection to Culvert</td> <td>2</td> <td>EA</td> <td>$1,000.00</td> <td>$2,000.00</td> <td>$400.00</td> <td>$800.00</td> <td>$520.00</td> <td>$1,040.00</td> </tr> <tr> <td>16</td> <td>6010-108-B-0</td> <td>Storm Intake, Type SW-513, 48"x48"</td> <td>1</td> <td>EA</td> <td>$7,500.00</td> <td>$7,500.00</td> <td>$4,800.00</td> <td>$4,800.00</td> <td>$5,000.00</td> <td>$5,000.00</td> </tr> <tr> <td>17</td> <td>7010-108-A-0</td> <td>PCC Pavement, 7"</td> <td>1,847</td> <td>SY</td> <td>$60.00</td> <td>$110,820.00</td> <td>$46.65</td> <td>$86,162.55</td> <td>$46.65</td> <td>$86,162.55</td> </tr> <tr> <td>18</td> <td>7020-108-B-0</td> <td>HMA Pavement, 8"</td> <td>261</td> <td>SY</td> <td>$75.00</td> <td>$19,575.00</td> <td>$82.50</td> <td>$21,532.50</td> <td>$110.20</td> <td>$28,762.20</td> </tr> <tr> <td>19</td> <td>7030-108-E-0</td> <td>PCC Sidewalk, 5"</td> <td>182</td> <td>SY</td> <td>$60.00</td> <td>$10,920.00</td> <td>$53.00</td> <td>$9,646.00</td> <td>$53.00</td> <td>$9,646.00</td> </tr> <tr> <td>20</td> <td>7030-108-G-0</td> <td>Detectable Warnings</td> <td>52</td> <td>SF</td> <td>$60.00</td> <td>$3,120.00</td> <td>$60.00</td> <td>$3,120.00</td> <td>$60.00</td> <td>$3,120.00</td> </tr> <tr> <td>21</td> <td>7040-108-H-0</td> <td>Removal of Pavement</td> <td>488</td> <td>SY</td> <td>$10.00</td> <td>$4,880.00</td> <td>$5.00</td> <td>$2,440.00</td> <td>$13.50</td> <td>$6,588.00</td> </tr> <tr> <td>22</td> <td>8020-108-B-0</td> <td>Painted Pavement Markings, Solvent/Waterborne</td> <td>12.90</td> <td>STA</td> <td>$200.00</td> <td>$2,580.00</td> <td>$220.00</td> <td>$2,838.00</td> <td>$365.00</td> <td>$4,708.50</td> </tr> <tr> <td>23</td> <td>8030-108-G-0</td> <td>Painted Symbols and Legends</td> <td>6</td> <td>EA</td> <td>$250.00</td> <td>$1,500.00</td> <td>$110.00</td> <td>$660.00</td> <td>$100.00</td> <td>$600.00</td> </tr> <tr> <td>24</td> <td>8030-108-A-0</td> <td>Traffic Control</td> <td>1</td> <td>LS</td> <td>$5,000.00</td> <td>$5,000.00</td> <td>$2,750.00</td> <td>$2,750.00</td> <td>$5,000.00</td> <td>$5,000.00</td> </tr> <tr> <td>25</td> <td>9010-108-A-3</td> <td>Mulching for Erosion Control</td> <td>0.25</td> <td>ACRE</td> <td>$1,500.00</td> <td>$375.00</td> <td>$3,300.00</td> <td>$825.00</td> <td>$3,000.00</td> <td>$750.00</td> </tr> <tr> <td>26</td> <td>9010-108-B-3</td> <td>Seeding, Fertilizing and Mulching for Hydraulic Seeding, Type 1 Seed Mixture</td> <td>0.25</td> <td>ACRE</td> <td>$5,000.00</td> <td>$1,250.00</td> <td>$8,250.00</td> <td>$2,062.50</td> <td>$7,500.00</td> <td>$1,875.00</td> </tr> <tr> <td>27</td> <td>9040-108-A-2</td> <td>SWPPP Management</td> <td>1</td> <td>LS</td> <td>$5,000.00</td> <td>$5,000.00</td> <td>$1,650.00</td> <td>$1,650.00</td> <td>$1,500.00</td> <td>$1,500.00</td> </tr> <tr> <td>28</td> <td>9040-108-J-0</td> <td>Erosion Stone Riprap</td> <td>20</td> <td>TONS</td> <td>$50.00</td> <td>$1,000.00</td> <td>$75.00</td> <td>$1,500.00</td> <td>$55.00</td> <td>$1,100.00</td> </tr> <tr> <td>29</td> <td>9040-108-N-1</td> <td>Silt Fence</td> <td>500</td> <td>LF</td> <td>$3.00</td> <td>$1,500.00</td> <td>$2.20</td> <td>$1,100.00</td> <td>$2.00</td> <td>$1,000.00</td> </tr> <tr> <td>30</td> <td>9040-108-N-1</td> <td>Filter Sock</td> <td>500</td> <td>LF</td> <td>$3.00</td> <td>$1,500.00</td> <td>$2.75</td> <td>$1,375.00</td> <td>$2.50</td> <td>$1,250.00</td> </tr> <tr> <td>31</td> <td>9040-108-N-2</td> <td>Silt Fence, Clean Out Sediment</td> <td>500</td> <td>LF</td> <td>$1.00</td> <td>$500.00</td> <td>$0.55</td> <td>$275.00</td> <td>$0.50</td> <td>$250.00</td> </tr> <tr> <td>32</td> <td>9040-108-S-1</td> <td>Inlet Protection Device</td> <td>1</td> <td>FA</td> <td>$750.00</td> <td>$750.00</td> <td>$110.00</td> <td>$110.00</td> <td>$100.00</td> <td>$100.00</td> </tr> <tr> <td>33</td> <td>9040-108-S-2</td> <td>Inlet Protection Device Maintenance</td> <td>1</td> <td>EA</td> <td>$200.00</td> <td>$200.00</td> <td>$55.00</td> <td>$55.00</td> <td>$50.00</td> <td>$50.00</td> </tr> <tr> <td>34</td> <td>11010-108-A-0</td> <td>Construction Survey</td> <td>1</td> <td>LS</td> <td>$5,000.00</td> <td>$5,000.00</td> <td>$3,500.00</td> <td>$3,500.00</td> <td>$4,250.00</td> <td>$4,250.00</td> </tr> <tr> <td>35</td> <td>11020-108-A-0</td> <td>Mobilization</td> <td>1</td> <td>LS</td> <td>$25,000.00</td> <td>$25,000.00</td> <td>$9,000.00</td> <td>$9,000.00</td> <td>$14,500.00</td> <td>$14,500.00</td> </tr> </table> *Numbers in italics differ from submitted bid form $312,005.00 $248,581.55 $262,983.50

Sources

  • sharepoint (I-2 - Resolution 2024-015 - Award of Bid for Kimberlite Street - South Improvements Project.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.