resolution · I-4
I-4 - Resolution 2024-051 - Award of Bid for Water Treatment Plant Upgrade - Electrical Equipment and Controls
Page 4 of 4
Text read by the vision model; check the PDF for anything that matters.OWNER: City of Tiffin, Iowa
PROJECT: Water Treatment Plant Upgrade - Electrical Equipment Procurement
BID TABULATION
<table>
<tr>
<th rowspan="2">ITEM NO.</th>
<th rowspan="2">ITEM DESCRIPTION</th>
<th rowspan="2">ESTIMATED QUANTITY</th>
<th rowspan="2">UNITS</th>
<th colspan="2">Altorfer Power Systems<br>2550 6th Street SW<br>Cedar Rapids, IA 52404</th>
<th colspan="2">Cummins Sales and Service<br>1680 N.E. 51st Avenue<br>Des Moines, IA 50313</th>
<th colspan="2">Automatic Systems Co.<br>2740 Ford Street<br>Ames, IA 50010</th>
<th colspan="2">Pinnacle Engineering<br>1000 27th Avenue SW<br>Cedar Rapids, IA 52317</th>
</tr>
<tr>
<th>UNIT PRICE</th>
<th>TOTAL PRICE</th>
<th>UNIT PRICE</th>
<th>TOTAL PRICE</th>
<th>UNIT PRICE</th>
<th>TOTAL PRICE</th>
<th>UNIT PRICE</th>
<th>TOTAL PRICE</th>
</tr>
<tr>
<td>EP1</td>
<td>Standby Generator and ATS</td>
<td>1</td>
<td>LS</td>
<td>$329,890.00</td>
<td>$329,890.00</td>
<td>$379,300.00</td>
<td>$379,300.00</td>
<td>No Bid</td>
<td>No Bid</td>
<td>No Bid</td>
<td>No Bid</td>
</tr>
<tr>
<td>EP2</td>
<td>Electrical Equipment and Controls</td>
<td>1</td>
<td>LS</td>
<td>No Bid</td>
<td>No Bid</td>
<td>No Bid</td>
<td>No Bid</td>
<td>$1,172,339.00</td>
<td>$1,172,339.00</td>
<td>$1,282,586.00</td>
<td>$1,282,586.00</td>
</tr>
<tr>
<td>A1</td>
<td>Electrical Equipment for Elevated Storage Tank</td>
<td>1</td>
<td>LS</td>
<td>No Bid</td>
<td>No Bid</td>
<td>No Bid</td>
<td>No Bid</td>
<td>$12,015.00</td>
<td>$12,015.00</td>
<td>$13,711.00</td>
<td>$13,711.00</td>
</tr>
</table>
Sources
- sharepoint (I-4 - Resolution 2024-051 - Award of Bid for Water Treatment Plant Upgrade - Electrical Equipment and Controls.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.