contract agreement · K-3
K-3 - Professional Services Agreement - Recreation Center - Atura Architecture
Page 4 of 9
Text read by the vision model; check the PDF for anything that matters.(List name, address, and other contact information.)
§ 1.1.10 The Owner shall retain the following consultants and contractors:
(List name, legal status, address, and other contact information.)
.1 Construction Manager:
(The Construction Manager is identified on the cover page. If a Construction Manager has not been retained as of the date of this Agreement, state the anticipated date of retention. If the Architect is to assist the Owner in selecting the Construction Manager, complete Section 4.1.1.1)
TBD
The Architect will assist the Owner in selecting the Construction Manager.
.2 Land Surveyor:
TBD
The Architect shall coordinate and acquire multiple proposals to present to the Owner for consideration.
.3 Geotechnical Engineer:
TBD
(Paragraphs deleted)
The Architect shall coordinate and acquire multiple proposals to present to the Owner for consideration.
§ 1.1.11 The Architect identifies the following representative in accordance with Section 2.4:
(List name, address, and other contact information.)
Mark Kroemer, Architect Manager
Atura Architecture
912 North 13th Street
Clear Lake, IA 50428
§ 1.1.12 The Architect shall retain the consultants identified in Sections 1.1.12.1 and 1.1.12.2:
(List name, legal status, address, and other contact information.)
§ 1.1.12.1 Consultants retained under Basic Services:
.1 Structural Engineer:
TBD
.2 Mechanical Engineer:
TBD
Sources
- sharepoint (K-3 - Professional Services Agreement - Recreation Center - Atura Architecture.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.