contract agreement · K-3
K-3 - Professional Services Agreement - Recreation Center - Atura Architecture
Page 2 of 9
Text read by the vision model; check the PDF for anything that matters.TABLE OF ARTICLES
1 INITIAL INFORMATION
2 ARCHITECT'S RESPONSIBILITIES
3 SCOPE OF ARCHITECT'S BASIC SERVICES
4 SUPPLEMENTAL AND ADDITIONAL SERVICES
5 OWNER'S RESPONSIBILITIES
6 COST OF THE WORK
7 COPYRIGHTS AND LICENSES
8 CLAIMS AND DISPUTES
9 TERMINATION OR SUSPENSION
10 MISCELLANEOUS PROVISIONS
11 COMPENSATION
12 SPECIAL TERMS AND CONDITIONS
13 SCOPE OF THE AGREEMENT
ARTICLE 1 INITIAL INFORMATION
§ 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1.
(For each item in this section, insert the information or a statement such as "not applicable" or "unknown at time of execution.")
§ 1.1.1 The Owner's program for the Project:
(Insert the Owner's program, identify documentation that establishes the Owner's program, or state the manner in which the program will be developed.)
A recreation center building with a community room, multi-sport athletic courts, turf area, workout area, upper level track, and other accessory spaces..
§ 1.1.2 The Project's physical characteristics:
(Identify or describe pertinent information about the Project's physical characteristics, such as size; location; dimensions; geotechnical reports; site boundaries; topographic surveys; traffic and utility studies; availability of public and private utilities and services; legal description of the site, etc.)
The facility will be a 150' x 240' pre-engineered steel structure located in the southeast corner of US Hwy 6 and South Park Road. The design of the facility will be based on the presentation drawings dated 9/17/2024.
§ 1.1.3 The Owner's budget for the Cost of the Work, as defined in Section 6.1:
(Provide total and, if known, a line item breakdown.)
$9,305,000 - $9,460,000
§ 1.1.4 The Owner's anticipated design and construction milestone dates:
.1 Design phase milestone dates, if any:
Design Development: December 2024 – January 2025