contract agreement · K-2

K-2 - Professional Services Agreement for Construction - Water Plant - MSA

Open the PDF Searchable (OCR) PDF

Page 4 of 5

Text read by the vision model; check the PDF for anything that matters.
For services of Engineer’s Resident Project Representative an amount equal to the cumulative hours charged to the Project by each class of Engineer’s personnel times Standard Hourly Rates for each applicable billing class for all Resident Project Representative services performed on the Project, plus related Reimbursable Expenses and Engineer’s Consultant’s charges, if any. The total compensation under this Phase is based upon an assumed total number of hours of RPR services of 1,200 hours. d) Coordinate and attend virtual loop and screen shot review meetings with the System Integrator and the RO equipment supplier. We have estimated 30 hours for MSA staff for this service 4) Operational Phase LUMP SUM a) Prepare and provide two (2) copies of Operation and Maintenance manuals as required, associated with the Water Treatment Facility b) Prepare and provide two (2) copies of record drawings depicting the nature of the construction modifications; c) Complete an 11th month warranty review, approximately 11 months after substantial completion of the project. Warranty reviews shall include onsite observation with OWNER to determine items of non-compliance with the project requirements, prior to the expiration of the required 1-year warranty. Associated with the completion of the above projects, MSA and their subconsultants shall also provide the following: ADMINISTRATION 1. Prepare and review billings to Owner in a timely manner. Items Not Included in Basic Services 1. Additional Meetings Attendance at any such meetings that are not specifically address above shall be considered above and beyond the scope of services as identified herein. 2. Land Acquisition services It has been assumed under this agreement that no services are required in association with land acquisition in relation to the construction identified. As such, any work in relation to land acquisition shall be considered out of scope of this agreement. 3. Study and Design Phase services It has been assumed under this agreement that study and design phase services have already been completed, as such any such services requiring either study or design phase services shall be considered out of the scope of the agreement.

Sources

  • sharepoint (K-2 - Professional Services Agreement for Construction - Water Plant - MSA.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.