other · M-11
M-11 - FGR Roundabout Improvements
Page 3 of 3
Text read by the vision model; check the PDF for anything that matters.EXISTING OVERHEAD ELECTRIC
PROPOSED RIGHT OF WAY
PROPOSED ELECTRIC RELOCATION BY CIPCO
EXISTING FLARED END SECTION
EXISTING INTAKE / STORM SEWER STREET LIGHT (TYP)
EXISTING PROPERTY LINE
CITY OF CORALVILLE PROPERTY LINE
PROPOSED STORM SEWER
PROPOSED DRAINAGE EASEMENT
APPROX. GRADING LIMITS
NEW STORM
5' PCC SIDEWALK
ROAD CLOSURE
PROPOSED STORM SEWER
NEW STORM
EXISTING FIBER OPTIC
EXISTING RIGHT OF WAY
8' PCC TRAIL (CONNECT TO BRIDGE)
SHIVEHATTERY ARCHITECTURE + ENGINEERING
FOREVERGREEN ROAD AND JASPER AVENUE IMPROVEMENTS
NORTH LIBERTY, IOWA
12/09/2024
PHASED CONSTRUCTION
SCALE: SCALE IN FEET
EXHIBIT: 1.3
Sources
- sharepoint (M-11 - FGR Roundabout Improvements.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.