other · M-11

M-11 - FGR Roundabout Improvements

Open the PDF Searchable (OCR) PDF

Page 2 of 3

Text read by the vision model; check the PDF for anything that matters.
EXISTING OVERHEAD ELECTRIC PROPOSED RIGHT OF WAY PROPOSED ELECTRIC RELOCATION BY CIPCO EXISTING FLARED END SECTION EXISTING INTAKE / STORM SEWER STREET LIGHT (TYP) TEMPORARY TWO LANE ROAD PROPOSED STORM SEWER PROPOSED DRAINAGE EASEMENT APPROX. GRADING LIMITS NEW STORM 5' PCC SIDEWALK EXISTING PROPERTY LINE CITY OF CORALVILLE PROPERTY LINE PROPOSED STORM SEWER NEW STORM EXISTING FIBER OPTIC EXISTING RIGHT OF WAY 8' PCC TRAIL (CONNECT TO BRIDGE) SHIVEHATTERY ARCHITECTURE + ENGINEERING FOREVERGREEN ROAD AND JASPER AVENUE IMPROVEMENTS NORTH LIBERTY, IOWA 12/09/2024 TEMP ACCESS ROADS AND PHASED CONSTRUCTION SCALE: 1" = 20' EXHIBIT: 1.2

Sources

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.