engineering report · M-9
M-9 - City Engineer Report
Page 1 of 4
Text from the PDF text layer; check the PDF for anything that matters. PROJECT UPDATE A Review of MSA Projects in Your Community
City of Tiffin, IA
CLIENT LIAISON:
Andrew Inhelder, PE
Office: 319.364.4773
Cell: 515.802.0906
[email protected]
DATE:
May 1, 2025
ON-GOING PROJECTS
REVERSE OSMOSIS WATER TREATMENT PLANT DESIGN – CLINT WIENEN
The approval of the Agreement and issuance of the Notice to Proceed will be on the agenda for the May 6th
Council Meeting. It is anticipated that a Preconstruction Meeting will be held in mid-late May. We
anticipate that construction will start immediately after the preconstruction meeting is held.
HIGHWAY 6 CONCEPT AND COST ESTIMATE – JAMES WATTERS
Coordination with franchise utilities in the right-of-way is ongoing. MSA has received responses from most
utility coordinators. Preliminary work plans from utilities are due June 16, 2025.
The Public Involvement Meeting was held on April 22nd at City Hall. Resident comments and concerns have
been compiled and reviewed.
SYSTEMWIDE SANITARY SEWER MODEL – ERIC THOMPSON
Flow meters have been installed at three locations within the sanitary system. Preparation of the GIS data
required to build the model is also underway, with the focus on sewershed delineation and land use
classification.
PROJECT UPDATE
Page 1 of 4