contract agreement · J-1

J-1 - Miron Contract - Recreation Center - A133

Open the PDF

Page 4 of 24

Text from the PDF text layer; check the PDF for anything that matters.
« »Not Applicable § 1.1.10 The Owner shall retain the following consultants and contractors: (List name, legal status, address, and other contact information.) .1 Geotechnical Engineer: «Unidentified at this time .2 Civil Engineer: «Not Applicable .3 Other, if any: (List any other consultants retained by the Owner, such as a Project or Program Manager.) «Not Applicable » § 1.1.11 The Architect’s representative: (List name, address, and other contact information.) Mark Kroemer Atura Architecture 912 North 13th Street Clear Lake, IA 50428 [email protected] 641-357-1923 § 1.1.12 The Construction Manager identifies the following representative in accordance with Article 3: (List name, address, and other contact information.) « » Jonathan Daniels Miron Construction Co., Inc. 335 French Ct. SW Cedar Rapids, IA 54204 [email protected] 319-298-5200 § 1.1.13 The Owner’s requirements for the Construction Manager’s staffing plan for Preconstruction Services, as required under Section 3.1.9: (List any Owner-specific requirements to be included in the staffing plan.) « Not Applicable» § 1.1.14 The Owner’s requirements for subcontractor procurement for the performance of the Work: (List any Owner-specific requirements for subcontractor procurement.) « Trade packages to be bid on as defined in Article 9. » § 1.1.15 Other Initial Information on which this Agreement is based: «Not Applicable » § 1.2 The Owner and Construction Manager may rely on the Initial Information. Both parties, however, recognize that such information may materially change and, in that event, the Owner and the Construction Manager shall appropriately adjust the Project schedule, the Construction Manager’s services, and the Construction Manager’s compensation. The Owner shall adjust the Owner’s budget for the Guaranteed Maximum Price and the Owner’s anticipated design and construction milestones, as necessary, to accommodate material changes in the Initial Information. AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 10:57:51 ET on 09/18/2024 under Order No.4104244063 which expires on 01/20/2025, is not for resale, is licensed for 4 one-time use only, and may only be used in accordance with the AIA Contract Documents ® Terms of Service. To report copyright violations, e- mail [email protected]. User Notes: (3B9ADA45)

Sources

  • sharepoint (J-1 - Miron Contract - Recreation Center - A133.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.