contract agreement · J-1

J-1 - Miron Contract - Recreation Center - A133

Open the PDF

Page 3 of 24

Text from the PDF text layer; check the PDF for anything that matters.
(Provide total and, if known, a line item breakdown.) « Total estimated construction budget for the program indicated in Article 1.1.1 is to be determined.» § 1.1.4 The Owner’s anticipated design and construction milestone dates: .1 Design phase milestone dates, if any: « Unidentified at this time.» .2 Construction commencement date: «To be identified in the GMP Amendment..» .3 Substantial Completion date or dates: « To be identified in the GMP Amendment..» .4 Other milestone dates: « Not Applicable » § 1.1.5 The Owner’s requirements for accelerated or fast-track scheduling, or phased construction, are set forth below: (Identify any requirements for fast-track scheduling or phased construction.) «Not Applicable » § 1.1.6 The Owner’s anticipated Sustainable Objective for the Project: (Identify and describe the Owner’s Sustainable Objective for the Project, if any.) «Not Applicable » § 1.1.6.1 If the Owner identifies a Sustainable Objective, the Owner and Construction Manager shall complete and incorporate AIA Document E234™–2019, Sustainable Projects Exhibit, Construction Manager as Constructor Edition, into this Agreement to define the terms, conditions and services related to the Owner’s Sustainable Objective. If E234–2019 is incorporated into this agreement, the Owner and Construction Manager shall incorporate the completed E234–2019 into the agreements with the consultants and contractors performing services or Work in any way associated with the Sustainable Objective. § 1.1.7 Other Project information: (Identify special characteristics or needs of the Project not provided elsewhere.) « Not Applicable » § 1.1.8 The Owner identifies the following representative in accordance with Section 4.2: (List name, address, and other contact information.) Doug Boldt, City Administrator City of Tiffin 300 Railroad Street Tiffin, IA 52340 [email protected] 319-545-2572 § 1.1.9 The persons or entities, in addition to the Owner’s representative, who are required to review the Construction Manager’s submittals to the Owner are as follows: (List name, address and other contact information.) AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 10:57:51 ET on 09/18/2024 under Order No.4104244063 which expires on 01/20/2025, is not for resale, is licensed for 3 one-time use only, and may only be used in accordance with the AIA Contract Documents ® Terms of Service. To report copyright violations, e- mail [email protected]. User Notes: (3B9ADA45)

Sources

  • sharepoint (J-1 - Miron Contract - Recreation Center - A133.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.