ordinance · H-1
H-1 - Ordinance 2022-498 - Rezoning Lot 55, Madden Addition - R-2 to R-2-OPD
Page 9 of 9
Text read by the vision model; check the PDF for anything that matters.plum
BUILDING SYSTEMS, LLC
PLUM DESIGN SERVICES
1000 E. KATES ROAD, WISCONSIN RAPIDS, WI 54495
715-842-3600 | FAX 715-842-3601
plumdesignservices.com
PLUM DESIGN SERVICES INC. ASSUMES NO RESPONSIBILITY FOR ERRORS OR OMISSIONS IN THIS DRAWING. THIS DRAWING IS THE SOLE PROPERTY OF PLUM DESIGN SERVICES INC. AND SHALL NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF PLUM DESIGN SERVICES INC.
MEMBER
AIBD
AMERICAN INSTITUTE of BUILDING DESIGN
Creating where people live
Midwest Home Builders
3-Story 4-Plex
Dan Sweeting
PROJECT ID:
PDS # 3322
ISSUE DATE:
DATE: 09-21-16
DATE: 09-22-16
DATE: 09-17-16
DATE:
DATE:
DATE:
Elevations
3/16" = 1'-0"
THIS PAGE IS VESERED TO PRINT CHECK
DATE: 09-21-16
DATE: 09-22-16
DATE: 09-17-16
DATE:
DATE:
A.1
FRONT ELEVATION
Scale: 3/16" = 1'-0"
REAR ELEVATION
Scale: 3/16" = 1'-0"
ESTIMATED AREA - WALL CLADDING
<table>
<tr>
<th>MATERIAL TYPE</th>
<th>MATERIAL ELEVATION</th>
<th>MATERIAL AREA</th>
</tr>
<tr>
<td>Log Siding - Cedar</td>
<td>00.7%</td>
<td>3094 SF</td>
</tr>
<tr>
<td>Shingle Vertical Siding</td>
<td>04.2%</td>
<td>1776 SF</td>
</tr>
<tr>
<td>Shingle Wood Siding</td>
<td>07.1%</td>
<td>398 SF</td>
</tr>
<tr>
<td>Log Siding - Cedar</td>
<td>00.6%</td>
<td>1951 SF</td>
</tr>
<tr>
<td>Shingle Vertical Siding</td>
<td>04.0%</td>
<td>1077 SF</td>
</tr>
</table>
Third Flr Wall Hgt
30" - 4'7"
Third Floor
22" - 3'3/4"
Second Flr Wall Hgt
20" - 3'
Second Floor
18" - 1'7/8"
First Flr Wall Hgt
9" - 1'1/8"
First Floor
0" - 0"
T.O. Flooring - Overall
4" - 4"
Sources
- sharepoint (H-1 - Ordinance 2022-498 - Rezoning Lot 55, Madden Addition - R-2 to R-2-OPD.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.