Draft chapter 90: Water Service System

§ 90.09 Excavations

The 2026 draft's § 90.09 beside the current code's § 90.08: removed words are struck through, added words underlined.

Comparison with a draft: not adopted. The archive holds no public hearing, ordinance or vote adopting the recodified Code through the October 20, 2026 meeting packet. Until one is adopted, every page here compares the consolidated code with a draft that can still change: the revised draft with the October 6 changes is not in the archive.

A comparison with the August 2026 draft recodification prepared by Iowa Codification for the City. The draft has not been adopted and can still change; the current code (unofficial compilation) governs until a recodified Code is adopted. Matches between sections are made by machine from the texts and are reviewed where uncertain.

Renumbered or moved wording changed (78% same words)

What changed

All trench work, excavation, and backfilling required in making a connection shall be performed in accordance with applicable excavation the provisions as provided for installation of building sewers and/or the State Plumbing Code and the provisions of Chapter 135.

Word-level comparison of the current text with the draft's; spacing and paragraph breaks come from the documents' text. Footnotes are left out.

Current code

§ 90.08 Excavations

All trench work, excavation, and backfilling required in making a connection shall be performed in accordance with applicable excavation provisions as provided for installation of building sewers and/or the provisions of Chapter 135.

2010 Code, Chapter 90 · source page

2026 draft

§ 90.09 Excavations

All trench work, excavation, and backfilling required in making a connection shall be performed in accordance with the provisions of the State Plumbing Code and the provisions of Chapter 135.

August 2026 draft · page 190

Back to draft chapter 90 · All changes

Data last updated October 22, 2026. Built from the archive's documents; see how the data is built.