other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 190 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 90 WATER SERVICE SYSTEM
cause the same to be made and the costs and expenses thereof assessed against the serviced
property.
90.04 ABANDONED CONNECTIONS. When an existing water service is abandoned or
a service is renewed with a new tap in the main, all abandoned connections with the mains
shall be turned off at the corporation stop and made absolutely watertight.
90.05 PERMIT. Before any person makes a connection with the public water system, a
written permit must be obtained from the City. The application for the permit shall include a
legal description of the property, the name of the property owner, the name and address of the
person who will do the work, and the general uses of the water. If the proposed work meets
all the requirements of this Code and if all fees required under this chapter have been paid, the
permit shall be issued. Work under any permit must be completed within 60 days after the
permit is issued, except that when such time period is inequitable or unfair due to conditions
beyond the control of the person making the application, an extension of time within which to
complete the work may be granted. The permit may be revoked at any time for any violation
of the Code.
90.06 PERMIT FEE. Before any permit is issued, the person who makes the application
shall pay $250.00 to the Clerk.
90.07 COMPLIANCE WITH PLUMBING CODE. The installation of any water service
pipe and any connection with the water system shall comply with all pertinent and applicable
provisions, whether regulatory, procedural, or enforcement provisions, of the current edition
of the State Plumbing Code adopted by the City in Chapter 155 and the current edition of
SUDAS adopted by the City in Chapter 158
90.08 PLUMBER REQUIRED. All installations of water service pipes and connections to
the water system shall be made by a State-licensed plumber.
90.09 EXCAVATIONS. All trench work, excavation, and backfilling required in making a
connection shall be performed in accordance with the provisions of the State Plumbing Code
and the provisions of Chapter 135.
90.10 TAPPING MAINS. All taps into water mains shall be made by or under the direct
supervision of the Superintendent and in accordance with the following:
(Code of Iowa, Sec. 372.13(4))
1. SUDAS. The tapping of mains shall comply with the current edition of
SUDAS adopted by the City in Chapter 158.
2. Location Record. An accurate and dimensional sketch showing the exact
location of the tap shall be filed with the Superintendent in such a form as the
Superintendent shall require.
90.11 INSTALLATION OF WATER SERVICE PIPE. Water service pipes from the
main to the meter setting comply with the current edition of SUDAS adopted by the City in
Chapter 158. The pipe must be laid sufficiently waving and to such depth as to prevent
rupture from settlement or freezing.
90.12 RESPONSIBILITY FOR WATER SERVICE PIPE. All costs and expenses
incident to the installation, connection, and maintenance of the water service pipe from the
CODE OF ORDINANCES, TIFFIN, IOWA
- 728 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 18, 2026. Built from the archive's documents; see how the data is built.