Chapter 90 – Water Service System

4 pages

Open the PDF

Page 2 of 4

Text from the PDF text layer; check the PDF for anything that matters.
90.05 PERMIT. Before any person makes a connection with the public water system, a permit must be obtained from the City. The application for the permit shall include a legal description of the property, the name of the property owner, the name and address of the person who will do the work, and the general uses of the water. If the proposed work meets all the requirements of the Code and if all fees required under this chapter have been paid, the permit shall be issued. Work under any permit must be completed within sixty (60) days after the permit is issued, except that when such time period is inequitable or unfair due to conditions beyond the control of the person making the application, an extension of time within which to complete the work may be granted. The permit may be revoked at any time for any violation of the Code. 90.06 COMPLIANCE WITH PLUMBING CODE. The installation of any water service pipe and any connection with the water system shall comply with all pertinent and applicable provisions, whether regulatory, procedural or enforcement provisions, of the International Plumbing Code and the City Design Standards. 90.07 PLUMBER REQUIRED. All installations of water service pipes and connections to the water system shall be made by a plumber licensed by the State. 90.08 EXCAVATIONS. All trench work, excavation, and backfilling required in making a connection shall be performed in accordance with applicable excavation provisions as provided for installation of building sewers and/or the provisions of Chapter 135. 90.09 TAPPING MAINS. All taps into water mains shall be made by or under the direct supervision of the Superintendent and in accord with the following: (Code of Iowa, Sec. 372.13[4]) 1. Independent Services. No more than one house, building, or premises shall be supplied from one tap unless special written permission is obtained from the Superintendent and unless provision is made so that each house, building, or premises may be shut off independently of the other. 2. Sizes and Location of Taps. All mains six (6) inches or less in diameter shall receive no larger than a ¾-inch tap. All mains of over six inches in diameter shall receive no larger than a one-inch tap. Where a larger connection than a one-inch tap is desired, two or more small taps or saddles shall be used, as the Superintendent shall order. All taps in the mains shall be made in the top half of the pipe, at least eighteen (18) inches apart. No main shall be tapped nearer than two (2) feet of the joint in the main. 3. Corporation Stop. A brass corporation stop, of the pattern and weight approved by the Superintendent, shall be inserted in every tap in the main. The corporation stop in the main shall be of the same size as the service pipe. 4. Location Record. An accurate and dimensional sketch showing the exact location of the tap shall be filed with the Superintendent in such form as the Superintendent shall require. 90.10 INSTALLATION OF WATER SERVICE PIPE. Water service pipes from the main to the meter setting shall be Type K copper. The use of any other pipe material for the service line shall first be approved by the Superintendent. Pipe must be laid sufficiently waving, and to such depth, as to prevent rupture from settlement or freezing. 90.11 RESPONSIBILITY FOR WATER SERVICE PIPE. All costs and expenses incident to the installation, connection, and maintenance of the water service pipe from the main to the building served shall be borne by the owner. The owner shall indemnify the City from any loss or damage that may directly or indirectly be occasioned by the installation or maintenance of said water service pipe. 90.12 FAILURE TO MAINTAIN. When any portion of the water service pipe which is the responsibility of the property owner becomes defective or creates a nuisance and the owner fails to correct

Sources

  • citycode: Chapter 90 – Water Service System (Chapter-90-Water-Service-System.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.