City Council

City Council — regular meeting, June 22, 1990

Friday, June 22, 1990 0 agenda items 3 substantive motions, 1 procedural motion 1 documents

·

Motions carried
3
of 3 substantive motions (procedural ones aside)
Split votes
0
at least one "no", or the motion failed
Minutes
Read

Votes

Each motion as the minutes record it: the agenda heading and the motion line. Names come from the roll call; "all ayes (implied)" marks a motion where the minutes say only "All ayes" or "carried unanimously", which credits the members recorded as present. Read the minutes

otherroll call · p. 2

Motion Brown second Morgan to begin application process to the Federal Emergency Management Agency for the federal flood insurance program

Carried · moved by Pam Brown, seconded by Sandra Morgan

otherall ayes (implied) · p. 2

Motion Morgan second Brown to authorize Mayor to sign application when it arrives

Carried · moved by Sandra Morgan, seconded by Pam Brown

otherall ayes (implied) · p. 4

Motion Bartels second Stoner to hire part-time help at $5.00 per hour to assist Bob Herring with cleanup after the flood with a review at the next meeting

Carried · moved by Jim Bartels, seconded by Dave Stoner

Procedural motions (1): agenda, minutes, payables approval, closed session, adjournment
  • Motion Stoner second Slaymaker to adjourn at 8:25 pm — carried (all ayes (implied)) · p. 6

Attendance

Dave Stoner presentPam Brown presentSandra Morgan presentGlenn R. Potter (mayor) present

Agenda

The archive has no itemized agenda for this meeting.

Documents

DocumentTypePagesOriginal
Minutes-7 /22/1990 minutes6PDF

Sources

  • minutes
  • Minutes read by parser minutes/classic 2.7.3 from 1 copy.

This meeting as JSON · its votes as JSON

In the town's history

History notes, checked research claims and dated events of the town's history that cite this meeting or its documents.

  1. June 22, 1990 Disaster The council voted to begin the application to the Federal Emergency Management Agency for the federal flood insurance program.
    “Motion Brown second Morgan to begin application process to the Federal Emergency Management Agency for the federal flood insurance program. Roll call vote: Brown, aye; Bartels, aye; Stoner, aye; Slaymaker, aye; Morgan, aye. Carried unanimously.”
    document 4304, p. 2 · meeting · 1990s
  2. June 22, 1990 Disaster The city engineer estimated flood damage of $5,000 to the sewer plant electrical system, $2,700 to replace a road and $8,000 in street erosion and surface damage.
    “Hart: Electrical damage at the sewer plant is estimated at $5,000.00. The road will need to be replaced at an estimated cost of $2,700.00. Street erosion and surface damage is estimated at $8,000.00.”
    document 4304, p. 2 · meeting · 1990s
  3. June 22, 1990 Disaster The minutes of a special council meeting state it met on Friday, June 22, 1990 to discuss the flood.
    “The Tiffin city council met in special session on Friday, June 22, 1990 for the purpose of discussing the flood.”
    document 4304, p. 2 · meeting · 1990s
  4. June 22, 1990 Disaster The engineer told a special meeting that the creek rising, not a blocked culvert, flooded the mobile home court, and that the dike was okay.
    “The raising of the creek caused the problem. The dike was okay. A blocked up culvert didn't cause the trailer court to flood. It flooded because the creek raised.”
    document 4304, p. 5 · meeting · 1990s
  5. June 22, 1990 Disaster Motion Bartels second Stoner to hire part-time help at $5.00 per hour to assist Bob Herring with cleanup after the flood with a review at the next meeting document 4304, p. 4 · meeting · 1990s

Data last updated October 24, 2026. Built from the archive's documents; see how the data is built.