A RESOLUTION FOR AN EASEMENT WITH GRACE-BACULIS AND JOHNSTON-POTTERFIELD, IN TIFFIN, JOHNSON COUNTY, IOWA for the purpose of access to the water tower site was introduced by Stoner and
Carried · moved by Dave Stoner, seconded by Sandra Morgan
City Council
Each motion as the minutes record it: the agenda heading and the motion line. Names come from the roll call; "all ayes (implied)" marks a motion where the minutes say only "All ayes" or "carried unanimously", which credits the members recorded as present. Read the minutes
A RESOLUTION FOR AN EASEMENT WITH GRACE-BACULIS AND JOHNSTON-POTTERFIELD, IN TIFFIN, JOHNSON COUNTY, IOWA for the purpose of access to the water tower site was introduced by Stoner and
Carried · moved by Dave Stoner, seconded by Sandra Morgan
Motion Brown second Slaymaker to accept the modifications as completed by Vantage Cable Associates, Inc. at the company's risk, and to direct the city attorney to notify the company of the stipulations that if anything happens to the junction box in the ditch in the 100 block of Main Street it is the full responsibility of Vantage Cable, and that because the city has not been provided with accurate "as built" maps, if anything happens to the cable lines running through the city's rights-of-way, it is the full responsibility of Vantage Cable Company
Carried · moved by Pam Brown, seconded by Paul Slaymaker
Motion Slaymaker second Morgan that in compliance with new regulations adopted by State of Iowa effective July 1, 1990, all yard waste which residents wish to dispose of must be picked up in biodegradable sacks furnished by Iowa City Cleanup and Transfer at a cost of $1.25 per sack, to be sold through one of the businesses in Tiffin
Carried · moved by Paul Slaymaker, seconded by Sandra Morgan
Motion Bartels second Slaymaker to approve request by Louis Voparil to build a 30 foot by 32 foot garage at 221 Main Street as shown in plan submitted, with the stipulation that the current auxiliary structure be removed to be in compliance with Zoning ordinance No. 1979-83
Carried · moved by Jim Bartels, seconded by Paul Slaymaker
Motion Stoner second Slaymaker to approve request by Louis Voparil to construct an 8 foot x 40 foot addition to the east side of building at 230 Main Street as shown in plan submitted
Carried · moved by Dave Stoner, seconded by Paul Slaymaker
Motion Morgan second Brown to authorize Mayor Potter to sign agreement with L.L. Pelling for street work at the August, 1989 bid price to include 3-4 inch asphalt on curve in Railroad Street, seal coat all of Grant Street, Railroad Street between College and Grant, Third Street from College to the school, north end of Roberts Ferry Road and Second Street from Summerhays to Brown and to seal coat driveway and parking areas by maintenance building at a cost up to $17,000.00
Carried · moved by Sandra Morgan, seconded by Pam Brown
Motion Morgan second Stoennr to authorize Hart to negotiate and Mayor Potter to sign agreement for sewer line repairs up to a cost of $8,000.00
Carried · moved by Sandra Morgan, seconded by Stoennr
Motion Brown second Slaymaker to approve clerk-treasurer's reports
Carried · moved by Pam Brown, seconded by Paul Slaymaker
Jim Bartels presentPam Brown presentSandra Morgan presentPaul Slaymaker presentDave Stoner presentGlenn R. Potter (mayor) present
The archive has no itemized agenda for this meeting.
| Document | Type | Original |
|---|---|---|
| Minutes-05/09/1990 (2) | minutes | |
| Minutes-05/09/1990 | minutes |
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.