CHANGE ORDER REQUEST DATE: 6/13/2025 CONTRACT # 0 CHANGE ORDER REQUEST NO. 6 PROJECT: Tiffin Phase 3 Reconstruction Project CONTRACTOR: Rathje Construction CONTRACTOR PROJECT MANAGER: Dan Scofield CITY OF TIFFIN CONSTRUCTION PROJECT MANAGER: Ben Carhoff DESCRIPTION OF REQUEST: 1. It was requested that before paving is installed on Main Street & 3rd Avenue of the Tiffin Phase 3 Urbanization Project to install a 6" water service, 8" sanitary sewer service, 8" ADS storm sewer and a 16" RCP storm line would need to be stubbed out from under the paving to right of way for the future use of the empty lot of 501 Main Street. The 6" water service includes shutting down the existing watermain, cutting in an 8x8 Tee into the existing 8" watermain, installing a 6" valve, laying roughly 30' of 6" C-900 and installing a blowoff with thrust block for flushing and testing per SUDAS Specification 5030 testing and disinfection. 2. The 8" ADS HDPE includes cutting a new hole in the back of intake I-40, laying 20' of 8" HDPE and installing a concrete collar. 3. Other 2 items will be covered under original bid items. SUDAS SPECIFICATION SECTION TO SUPPORT REQUEST, DIVISION 1: JUSTIFICATION FOR THE REQUEST, WORKING DIVISION: <table> <tr> <th>Line No.</th> <th>Spec. #</th> <th>Item No.</th> <th>Item Description</th> <th>Quantity</th> <th>Unit</th> <th>Unit Price</th> <th>Mark up</th> <th>Unit Price w/ Markup</th> <th>Working Days Requested</th> <th>Proposed Increase (Decrease) in Contract Price</th> </tr> <tr> <td>1</td> <td></td> <td>8016</td> <td>6" Water Service</td> <td>1.00</td> <td>EA</td> <td>$10,807.49</td> <td>0.00%</td> <td>$10,807.49</td> <td>1</td> <td>$10,807.49</td> </tr> <tr> <td>2</td> <td></td> <td>8017</td> <td>8" HDPE Storm Sewer</td> <td>1.00</td> <td>EA</td> <td>$2,100.00</td> <td>0.00%</td> <td>$2,100.00</td> <td>1</td> <td>$2,100.00</td> </tr> <tr> <td colspan="9">Net Increase (Decrease)</td> <td>2</td> <td>$12,907.49</td> </tr> </table> SUPPORT DOCUMENTS INCLUDED: CONTRACT TIME IMPACT: (N/A) REVISED SCHEDULE PROVIDED? YES or NO STANDARD SUDAS BID ITEMS MUST BE USED IF POSSIBLE, OTHERWISE PROVIDE COST BREAKDOWN: INVOICES (REQUIRED): MATERIAL SUBMITTALS (REQUIRED): ADDITIONAL SUPPORT DOCUMENTS INCLUDED: This document does not change the Contract Price or Contract Time but is evidence that the parties expect that the subject changes will be incorporated into a subsequent Contract Change Order following negotiation by the parties as to effect, if any, upon Contract Price or Contract Time. Work shall not be deemed acknowledged per Division 1, General Provisions and Covenants until all signatures are received. Payment related to this document will only be made after execution of Contract Change Order through City Council.

Sources

  • revize: Attachment (NGPHWRQLYdTm5hsUWZcoSU1sPfXNpz.pdf) — where it was found ↗ first seen Oct 12, 2026
  • sharepoint (K-2 - Change Order 5 - Rathje Construction - Original Town Phase 3.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: K-2 Consideration of Change Order #5 – Rathje Construction, Original Town Urbanization...

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.