contract agreement · K-5
Discussion and Consideration of Professional Services Agreement Proposal from MSA Professional Services, Inc., for Tiffin Park Place Drainage Study – Motion to Approve
Page 2 of 5
Text from the PDF text layer; check the PDF for anything that matters. MSA Project Number: 13603029
This AGREEMENT (Agreement) is made effective August 5, 2025 by and between
MSA PROFESSIONAL SERVICES, INC (MSA)
Address: 6045 Rockwell Drive NE, Cedar Rapids, IA 52402
Phone: (319) 364-4773
Representative: Andrew Inhelder, PE Email: [email protected]
CITY OF TIFFIN (OWNER)
Address: 300 Railroad St, PO Box 259, Tiffin, IA 52340
Phone: (319) 545-2572
Representative: Doug Boldt Email: [email protected]
Project Name: Tiffin Park Place Drainage Study
The scope of the work authorized is: See Attachment A: Scope of Services
The schedule to perform the work is: Approximate Completion Date: August 15, 2025
The estimated fee for the work is: $20,000
This authorization for the work described above shall serve as the Agreement between MSA and
OWNER. All services shall be performed in accordance with the Master Professional Services
Agreement currently in force. Any attachments or exhibits referenced in this Agreement are made
part of this Agreement. Payment for these services will be on a time and materials basis. A list
of reimbursable expenses is included on the attached rate schedule.
Approval: MSA shall commence work on this project in accordance with your written
authorization. This authorization is acknowledged by signature of the authorized representatives
of the parties to this Agreement. A copy of this Agreement signed by the authorized
representatives shall be returned for our files.
CITY OF TIFFIN MSA PROFESSIONAL SERVICES, INC.
Doug Boldt Andrew Inhelder, PE
City Administrator Senior Project Manager Engineering
Date: Date: 08/01/2025
OWNER ATTEST:
Abigail Hora Jake Huck, PE
City Clerk Operations Leader
Date: Date: 08/01/2025
Page 1 of 3
G:\13\13603\13603029\Contract\13603029 Task Order.docx
Sources
- revize: Agreement (JLakRBGBECHTxk4bCBrVImd29CL0Lm.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (K-5 - Staff Report - MSA Professional Services Agreement - Tiffin Park Place Drainage Study1.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: Discussion and Consideration of Professional Services Agreement Proposal from MSA...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.