Text from the PDF text layer; check the PDF for anything that matters. Revised 8/4/25
Sand Vball Court(s)
Proposal good for 45 days
PREPARED FOR: Frank Haege
Address: Date: 6/24/2025
City / State / Zip: NL
email: [email protected]
Game Tile Estimated Phone: 612.206.4342
Goal Side Width:
Length: Option 1 Option 2 Option 3
72' x 46' area 72' x 46' area
TYPE SURFACE: Outdoor Sand Volleyball Sand Volleyball
1. SITE PREPARATION: Game Court Court
Tree Removal Fill Hauled Out
x Leveling x Fill Hauled In 52' 6" x 26' 3" 52' 6" x 26' 3"
x Fine Grading Fence Removal court court
*Other: 1 Vball Court 2 Vball Courts
Full Installation Full Installation
2. CONCRETE WORK:
4" approx thickness 4,000 p.s.i Approx 1" on 10' slope $0 $0 $0
x fiberglass rebar Hole concrete $100 min $450 $450 $450 $0
Hole charge $150 $300 $600 $0
CONCRETE PUMP: Distance Sono Tube - 24" x 3' deep $50 Pump Truck $100 $200 $0
Buggy
SUBTOTAL $850 $1,250 $0
3. COMPONENTS: Type: Price:
Painted Court lines Pickleball ( $550 ), Bball ( $650 )
x Gravel Clean Rock for drainage - 3" $30 / ton 54 tons / court $1,620 $3,240
x Sand Est 12-16" deep $6,000 $6,000 $12,000
x Hardware Sleeves, 4" square aluminum poles, net, line markers, pole pads $2,800 + freight $2,800 $5,600
Buggy Rental Required to pour and minimize ingress / egress ground disturbance.
Bball Hoop 60" glass. 6-10' adjustable. Break away rim
Hoop pads Pole pad / Board pad
Bball Hoop 72" glass. 6-10' adjustable. Break away rim
x Weed barrier 3300 sq ft $490 $490 $980
x Finger Drains Perforated tile under the court for drainage. $900 $900 $1,800
Rebounder 10' x 20'. Concrete. Full Installation
x Machine Hrs Digging out dirt. Spreading sand. Trucking $4,500 $8,500
Hoop Install Auger, Set anchor, Assemble, Install.
Component/Surface Total $16,310 $32,120 $0
4. Extra charges will apply if service requested:
x Black dirt / Sod around court. May be able to coordinate this. NOT included.
x Minor dirt landscaping around court. Compost, Seed, Fert pellets. May be able to coordinate this. NOT included.
x Mobilization billed @ $1.00/mile. miles round trip. truck trips $0
Extra Labor for misc billed @ $75 / $45 hour.
x Repair Ingress / Egress - compost, seed , fert, pellets. NOT included.
x In Iowa, Dial 811. Utility locates will need to be done before digging. Could alter costs if issues.
SUBTOTAL $17,160 $33,370 $0
Est Freight $300 $600 $0
SUBTOTAL $17,460 $33,970 $0
Customer Signature Date Extra's $0 $0 $0
Tax n/a n/a $0
Courts Fore Sports Date
TOTAL $17,460 $33,970 $0
Option:
Standard terms are 50% deposit, remainder at completion. Negotiable. Payment Schedule Courts Fore Sports
Jason Miller
No Credit Cards please. Total 4218 V Street
50% Deposit Invoice Due Homestead, IA 52236
Remaining Balance Due 319.531.0066
Thank you for the opportunity - we appreciate your business!! [email protected]
Sources
- revize: CMReport (emP9xFrN0ACc5mX2SOZQ2OoE4IEUPY.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (M-11 - CMReport.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: M Reports from City Personnel
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.