staff report memo · L-3
Tiffin Recreation Center Monthly Report
Page 11 of 19
Text from the PDF text layer; check the PDF for anything that matters.Progress Photos
Grid Line A footing formed Grid Line A footing poured
Grid Line 11 footing pour Grid Line F footing formed
Elevator walls and locker room footings Grid Line A and front stoop footing
poured formed
Owner Progress Report | 250120 October 2025 Miron Construction Co., Inc.
| 11