contract agreement · K-3

Discussion and Consideration of Pay Application #11 – Rathje Construction, Original Town – Motion to Approve

Open the PDF Searchable (OCR) PDF

Page 2 of 3

Text read by the vision model; check the PDF for anything that matters.
PARTIAL PAYMENT ESTIMATE NUMBER 11 CONTRACTOR: Rathje Construction Co. ADDRESS: 305 44th St., PO Box 408 CITY, STATE, ZIP Marlon, IA 52302 OWNER: CITY OF TIFFIN PROJECT: Original Town Urbanization - Phase 3 HFC#12218.131 <table> <tr> <th>Date of Completion:</th> <th>Amount of Contract:</th> <th>Date of Estimate:</th> </tr> <tr> <td>Original: 9/1/2025</td> <td>Original: $2,134,856.90</td> <td>From: 1-Oct-25</td> </tr> <tr> <td>Revised: 9/30/2025</td> <td>Revised: $2,171,676.79 (C.O. #7)</td> <td>To: 31-Oct-25</td> </tr> </table> <table> <tr> <th></th> <th>THIS PERIOD</th> <th>TOTAL TO DATE</th> </tr> <tr> <td>Amount Earned</td> <td>$55,710.50</td> <td>$2,069,970.66</td> </tr> <tr> <td>Add Material Stored On-Site</td> <td>$ -</td> <td>$ -</td> </tr> <tr> <td>Subtract Materials Installed On-Site</td> <td>$ -</td> <td>$ -</td> </tr> <tr> <td>Subtotal</td> <td>$ 55,710.50</td> <td>$2,069,970.66</td> </tr> <tr> <td>Retailage (5%)</td> <td>$ 2,785.53</td> <td>$ 103,498.53</td> </tr> <tr> <td>Previous Payments</td> <td></td> <td>$1,913,547.16</td> </tr> <tr> <td>Amount Due</td> <td>$ 52,924.97</td> <td>$ 52,924.97</td> </tr> </table> Estimated % of Job Complete Based on Amount Earned/Contract Amount only 97% This does not constitute work completed to date Is Contractor's Construction Progress on Schedule? YES NO N/A I hereby certify that I have carefully inspected the work and as a result of my inspection and to the best of my knowledge and belief, the quantities shown in this estimate are correct and have not been shown in previous estimates and the work has been performed in accordance with the contract documents. HART-FREDERICK CONSULTANTS P.C. By: [signature] Title: Project Engineer Date: November 12, 2025 Approved by Owner's Representative: By: ____________________________ Title: ____________________________ (Additional signatures -- if required) By: ____________________________ Title: ____________________________

Sources

  • revize: Attachment (y49cBbUCP2GtwFjKoGQeEIdgbwZNc8.pdf) — where it was found ↗ first seen Oct 12, 2026
  • sharepoint (K-3 - Pay Application #11 - Rathje Construction - Original Town Urbanization.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: K-3 Discussion and Consideration of Pay Application #11 – Rathje Construction, Original...

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.