Progress Photos Elevator shaft is complete Installation of underground plumbing in locker rooms Underground electrical being installed Thickened slabs under interior CMU to the East walls poured Locker room slab on grade poured and Southeast mechanical pad poured cut Owner Progress Report | 250120 November 2025 Miron Construction Co., Inc. | 12

Sheets in this document

  • p. 17 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 18 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 19 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 20 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 21 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 22 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 23 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 24 Concept Design · Hume Architects · Tiffin Events Center
  • p. 25 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 26 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 27 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 28 Concept Design · Hume Architects · Tiffin Events Center
  • p. 30 Floor Plan
  • p. 31 C120 · Final OPD Site Plan · MMS Consultants · Park Place City Center - Part One, Phase Four
  • p. 38 A.200 · West Elevation
  • p. 39 A.100 · Floor Plan · Level 2
  • p. 40 Floor Plan · Basement
  • p. 41 A.200 · Building Elevations
  • p. 42 A.201 · East Elevation
  • p. 43 Floor Plan · Level 2
  • p. 44 A.200 · Building Elevations
  • p. 45 Floor Plan · Level 2
  • p. 46 C200 · Site Layout Plan · Iowa DOT · Constructed as Part of Phase I Improvements
  • p. 47 C300 · Site Utilities Plan North · Grove Park Rowhomes
  • p. 48 C301 · Site Utilities Plan South · Grove Park Rowhomes
  • p. 49 Landscape Plan
  • p. 50 Preliminary Plat · Project Total
  • p. 51 2 · Preliminary Plat · Grove Park Rowhomes
  • p. 52 3 · Preliminary Plat
  • p. 91 map
  • p. 98 City of Tiffin FY 25-26 Town Hours by Month (chart; data on p. 97)
  • p. 134 Site Concrete
  • p. 135 Gym Floor and Slab on Grade · MEP

Sources

  • revize: Agenda packet (packet_2025-12-16_68f8c41f-ab61-420c-9e5a-6c45e968ae57.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 21, 2026. Built from the archive's documents; see how the data is built.