packet

Packet: Tiffin Regular City Council Meeting (12/16/2025)

Open the PDF Searchable PDF tesseract layer

Page 129 of 141

Text from the PDF text layer; check the PDF for anything that matters.
Contract Summary Contract Summary Construction Manager Contingency Summary Owner Contingency Summary Original Contract Amount: $12,435,142.00 CMaR Contingency Amount: $567,585.00 Owner Contingency Amount: $0.00 Change Orders to Date: -$1,042,001.88 Change Orders to Date: -$110,206.02 Change Orders to Date: $225,451.17 Current Contract Value: $11,393,140.12 CMaR Contingency Value: $457,378.98 Owner Contingency Value: $225,451.17 Current Scope Revisions CMaR Owner Allowance Contingency Contingency Estimated Cost Description Number Date Submitted Status Item? Item? Item? Impact 100% IFC Set - Civil BP1 (Add Fire Protection Line) 001 6/16/2025 Approved Yes Yes $7,300.12 ASI-01 Civil Utility Information 002 7/3/2025 Approved $0.00 Bid Package #2 Bid Documents and Drawing Updates 003 9/8/2025 Approved $0.00 Finalize Contract Budgets from Bid Package #2 004 8/21/2025 Approved $0.00 BP #2 Contract Reconciliation 005 9/25/2025 Approved -$1,042,001.88 ASI-02 Transformer Pad, Changes Related to PEMB, Changes Related to Elevator 006 10/3/2025 Approved Yes -$53,254.03 Credit to change electrical wiring to MC cable in metal studs per RFI #6 007 10/3/2025 Approved Yes $7,358.01 ASI-03 Add Door to Mechancial Room 008 11/4/2025 Approved Yes -$12,063.59 Reroute existing water and swere line to move ou for aggregate piers 009 10/9/2025 Approved Yes -$14,543.95 ASI-04 Add additional water piping per city comments 010 11/5/2025 Approved Yes -$86,485.30 ASI-05 Electrical Modifications 011 10/31/2025 Approved Yes $0.00 ASI-06 Fire Alarm change to Voice 012 10/31/2025 Approved Yes -$30,591.94 ASI-07 Fire Marshal Modifications (additional signage,elevator knox box) 013 11/21/2025 In Review Yes -$2,495.58 Paper faced abuse board in lieu of glass-mat board 014 11/5/2025 Approved Yes $4,100.00 ASI-08 Panel C Cut Joints 015 11/25/2025 In Review Yes $0.00 ASI-09 Structural Foundation Revisions 016 11/18/2025 In Review Yes -$883.48 Owner Progress Report | 250120 November 2025 Miron Construction Co., Inc. | 10

Sheets in this document

  • p. 17 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 18 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 19 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 20 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 21 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 22 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 23 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 24 Concept Design · Hume Architects · Tiffin Events Center
  • p. 25 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 26 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 27 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 28 Concept Design · Hume Architects · Tiffin Events Center
  • p. 30 Floor Plan
  • p. 31 C120 · Final OPD Site Plan · MMS Consultants · Park Place City Center - Part One, Phase Four
  • p. 38 A.200 · West Elevation
  • p. 39 A.100 · Floor Plan · Level 2
  • p. 40 Floor Plan · Basement
  • p. 41 A.200 · Building Elevations
  • p. 42 A.201 · East Elevation
  • p. 43 Floor Plan · Level 2
  • p. 44 A.200 · Building Elevations
  • p. 45 Floor Plan · Level 2
  • p. 46 C200 · Site Layout Plan · Iowa DOT · Constructed as Part of Phase I Improvements
  • p. 47 C300 · Site Utilities Plan North · Grove Park Rowhomes
  • p. 48 C301 · Site Utilities Plan South · Grove Park Rowhomes
  • p. 49 Landscape Plan
  • p. 50 Preliminary Plat · Project Total
  • p. 51 2 · Preliminary Plat · Grove Park Rowhomes
  • p. 52 3 · Preliminary Plat
  • p. 91 map
  • p. 98 City of Tiffin FY 25-26 Town Hours by Month (chart; data on p. 97)
  • p. 134 Site Concrete
  • p. 135 Gym Floor and Slab on Grade · MEP

Sources

  • revize: Agenda packet (packet_2025-12-16_68f8c41f-ab61-420c-9e5a-6c45e968ae57.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 21, 2026. Built from the archive's documents; see how the data is built.